Important! This Mira Event XS
must be xed to the wall at all three
xing positions. The xing holes are
elongated to assist in vertical and
horizontal alignment.
3.14. Screw the Mira Event XS to the wall
using either the supplied wall screws
or alternative xings depending on
the wall structure.
Do not over-tighten!
Ensure that the electrical supply cable
is correctly seated in the channel in
the back of the case.
3.15. Connect the conductors of the
electrical supply cable to the terminal
block. The supply cable earth
connector should be sleeved.
3.16. Tu r n t h e f l o w s p i n d l e f u l l y
clockwise so that the at is facing
towards11 o'clock.
3.17 Turn the ow knob fully clockwise
on the cover so that the indicator is
pointing to the off position.
3.18 Ret the cover and secure with the
three cover retaining screws.
3.19. Ret the temperature control knob
and the concealing cap.
3.20. This completes the installation of the
Mira Event XS. The appliance will
now require commissioning. Refer
to section: 'Commissioning'.
3.21. To install the shower ttings, refer to
your shower ttings Installation and
User Guide.