Installation Guide

Table Of Contents
WALL-MOUNT FAUCET INSTALLATION WALL-MOUNT FAUCET INSTALLATION
BEFORE YOU BEGIN
We recommend consulting a professional if you are
unfamiliar with installing bathroom fixtures and
plumbing. Signature Hardware accepts no liability for
any damage to the floor, walls, plumbing, or personal
injury during installation.
For the following installation instructions, it is
assumed that any old fixture has been removed and
the main water supply is prepared for faucet installation.
Unpack and inspect the item for damage. If any
damage is found, contact our Customer Relations.
TOOLSAND MATERIALS:OOLS
Plumber’s Tape*
Drill*
Thread Sealant*
Tape Measure* Level*
Hex Wrench
1
ROTUNDA WALL-MOUNT FAUCET INSTALLATION
GETTING STARTED
Rotunda Wall-Mount Faucet Installation Instructions
TOOLS AND MATERIALS:
BEFORE YOU BEGIN
We recommend consulting a professional if you are
unfamiliar with installing bathroom fixtures and
plumbing. Signature Hardware accepts no liability for
any damage to the floor, walls, plumbing, or personal
injury during installation.
For the following installation instructions, it is
assumed that any old fixture has been removed and
the main water supply is prepared for faucet installa-
tion.
Unpack and inspect the item for damage. If any
damage is found, contact our Customer Relations
team at 1-866-855-2284.
Ensure that you have gathered all of the required
materials that are needed for the installation.
Plumber抯 Tape
Shut o ffthe main water supply where the new faucet
is being installed.
PLANNING
Use the faucet’s PDF specification sheet as a refer-
ence when planning your installation. The specifica
Because the faucet specification
measurements are approximate and slight variations
may occur, we highly recommend performing any
rough-in procedures with the faucet on site.
Drill
Thread Sealant
Tape Measure
Level
Hex Wrench
Flathead
Screwdriver
Pipe Clamps
SKU(s): 919045
RENIST
RENIST
Ensure that you have gathered all of the required
materials that are needed for the installation.
Plumbers Tape.
Shut off the main water supply where the new faucet
is being installed.
GETTING STARTED
PLANNING
Use the faucets PDF specication sheet as a
reference when planning your installation.
Because the faucet specication measurements are
approximate and slight variations may occur, we
highly recommend performing any rough-in
procedures with the faucet on site.
INSTALLATION
1. Prepare for installation by installing wood blocking
between the two studs where the faucet will mount.
Important: Take into consideration the thickness of
your finished wall materials, such as tile, when calculating
measurements.
2. Mount the valve body in its prepared location. Attach
the valve body to the wood blocking using pipe clamps.
Use a level to ensure that the valve is mounted straight.
Important: Leave the protective plastic sleeves on the
valve until your finished wall is completed.
3. Attach your existing water lines to the valve body.
Apply thread sealant or plumbers tape to the threaded
connection to ensure a watertight seal.
4. Once your finished wall has been completed,
remove the protective plastic sleeves from the valve
body.

Summary of content (2 pages)