Technical Specifications
132
Hangers
© 2015 MiTek. All rights reserved.
HWUH Heavy-Duty Welded Universal Hangers
Floor
Uplift
1
Ref. No. W H Qty Type Qty Type 100% 115% 125% 160%
6 10d 4 10d x 1-1/2 2265 2265 2265 930
2 1/2 x 6 Emb. J-Bolt 4 10d x 1-1/2 2265 2265 2265 930
6 10d 4 10d x 1-1/2 2265 2265 2265 930
2 1/2 x 6 Emb. J-Bolt 4 10d x 1-1/2 2265 2265 2265 930
6 10d 4 10d x 1-1/2 2265 2265 2265 930
2 1/2 x 6 Emb. J-Bolt 4 10d x 1-1/2 2265 2265 2265 930
6 10d 4 10d x 1-1/2 2265 2265 2265 930
2 1/2 x 6 Emb. J-Bolt 4 10d x 1-1/2 2265 2265 2265 930
6 10d 4 10d x 1-1/2 2265 2265 2265 930
2 1/2 x 6 Emb. J-Bolt 4 10d x 1-1/2 2265 2265 2265 930
6 10d 4 10d x 1-1/2 2265 2265 2265 930
2 1/2 x 6 Emb. J-Bolt 4 10d x 1-1/2 2265 2265 2265 930
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
6 10d 4 10d 3800 3800 3800 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 3800 3800 3800 1035
1) Uplift loads have been increased 60% for wind or seismic loads; no further increase shall be permitted.
2) Minimum nail embedment shall be 1-1/2˝ for 10d nails.
3)
NAILS:
10d nails are 0.148˝ dia. x 3˝ long, NA21 nails are 0.192˝ dia. x 1-3/4˝ long and are included with 4x, 6x, and 8x HWUH hangers.
New products or updated product information are designated in
blue font
.
Floor
Uplift
1
Ref. No. W H Qty Type Qty Type 100% 115% 125% 160%
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
6 NA21 4 10d 5165 5165 5165 1035
2 1/2 x 6 Emb. J-Bolt 4 10d 5165 5165 5165 1035
1) Uplift loads have been increased 60% for wind or seismic loads; no further increase shall be permitted.
2) Minimum nail embedment shall be 1-1/2˝ for 10d nails.
3)
NAILS:
10d nails are 0.148˝ dia. x 3˝ long, NA21 nails are 0.192˝ dia. x 1-3/4˝ long and are included with 4x, 6x, and 8x HWUH hangers.
New products or updated product information are designated in
blue font
.
Fastener Schedule
2,3
DF/SP Allowable Loads (Lbs.)
Beam/
Joist Size
USP
Stock No.
Header Joist Roof
Code
Ref.
Dimensions (in)
Code
Ref.
130
130
HWUH46 -- -- 3-9/16 5-3/8
4 x 8
-- --
2 x 12 HWUH212 -- --
2 x 10
-- --
3 x 6 HWUH36 -- --
3 x 8 HWUH38 -- --
DF/SP Allowable Loads (Lbs.)
Roof
HWUH48
4 x 6
Fastener Schedule
2,3
Header Joist
2-5/8
2-5/8
2-5/8 3 x 14 HWUH314 -- --
3 x 16 HWUH316 -- --
3 x 10 HWUH310 -- --
3 x 12
Dimensions (in)
HWUH312 -- --
2 x 4 - 6 -- -- 1-5/8 HWUH26
HWUH210
2 x 14 HWUH214 -- --
2 x 16 HWUH216 -- --
2 x 8 HWUH28 -- --
(2) 2 x 10 HWUH210-2 -- --
(2) 2 x 12 HWUH212-2 -- --
(2) 2 x 6 HWUH26-2 -- --
(2) 2 x 8 HWUH28-2 -- --
-- --
4 x 12 HWUH412 -- --
4 x 14 HWUH414 -- --
(2) 2 x 14 HWUH214-2 -- --
(2) 2 x 16 HWUH216-2 -- --
4 x 10 HWUH410
Beam/
Joist Size
USP
Stock No.
6 x 8 HWUH68 -- --
6 x 10 HWUH610 -- --
4 x 16 HWUH416 -- --
6 x 6 HWUH66 -- --
-- --
8 x 6 HWUH86 -- --
6 x 12 HWUH612 -- --
6 x 14 HWUH614 -- --
8 x 16 HWUH816 -- --
1-5/8
1-5/8
1-5/8
1-5/8
1-5/8
2-5/8
2-5/8
8 x 12 HWUH812 -- --
8 x 14 HWUH814 -- --
8 x 8 HWUH88 -- --
8 x 10 HWUH810 -- --
6 x 16 HWUH616
5-3/8
7-1/8
9-1/8
5-3/8
11
13
5-3/8
7-1/8
9-1/8
16
11
13
16
7-1/8
9-1/8
11
13
16
3-1/8
3-1/8
2-5/8
3-1/8
3-1/8
3-1/8
3-1/8
7-1/8
9-1/8
11
13
16
7-1/2
7-1/2
7-1/2
7-1/2
7-1/2
5-3/8
5-1/2
5-1/2
5-1/2
7-1/2
16
3-9/16
3-9/16
3-9/16
3-9/16
3-9/16
5-1/2
5-1/2
5-1/2
7-1/8
9-1/8
11
13
11
13
16
5-3/8
7-1/8
9-1/8
Versatile heavy-duty top ange hanger attaches to both wood and
masonry. Unique design allows builders to use one style hanger on
the job when the structure has a variety of support materials.
Materials: Top Flange – 1/4" steel; Stirrup – 7 gauge
Finish: USP primer
Options: See Specialty Options Chart on page 133.
Codes: See page 11 for Code Reference Chart
Installation:
• Use all specied fasteners. See Product Notes, page 17.
• NA21 nails are included with hangers where specied.
• NA21 nails are not recommended for use with LVL, PSL,
or LSL headers.
• Masonry design load values apply to both solid concrete tie beams
and grout-lled CMU walls.
• Alternate installation – Use (2) 1/2" x 4" Powers Fasteners
Wedge-Bolts
®
or equal for loads up to 2,400 lbs. when attaching
to CMU. Loads shall not exceed table loads.
Typical HWUH410
wood-to-masonry installation
HWUH
Typical HWUH410
wood-to-wood installation
Continued on next page
Hangers
H
W
3-1/2"
3-1/2"
3-1/2"
10"