Technical Specifications

127
Hangers
© 2015 MiTek. All rights reserved.
Floor
Uplift
1
Floor
Uplift
1
Ref. No. W H D Qty Type Qty Type 100% 115% 125% 160% 100% 115% 125% 160%
2 x 6-8 SKHH26L/R -- -- 14 1-5/8 5-1/8 3-1/4 18 16d 12 10d x 1-1/2 1510 1740 1890 2190 1305 1505 1635 1900
2 x 8-12 SKHH28L/R -- -- 14 1-5/8 7 3-1/4 26 16d 16 10d x 1-1/2 2185 2510 2730 2920 1890 2170 2360 2535
2 x 10-14 SKHH210L/R -- -- 14 1-5/8 9 4-1/4 34 16d 20 10d x 1-1/2 2855 3285 3570 3650 2470 2840 3085 3170
SKHH26L/R-2 HSUR/L26-2 14 3-1/16 5-1/4 2 12 16d 4 16d x 2-1/2 1680 1930 2100 895 1450 1670 1815 775
SKHH26L/R-2IF HSUR/LC26-2 14 3-1/16 5-1/4 2 12 16d 4 16d x 2-1/2 1680 1930 2100 895 1450 1670 1815 775
SKHH210L/R-2
HSUR/L210-2,
HSUR/L214-2
14 3-1/16 8-1/2 2 20 16d 6 16d x 2-1/2 2800 3220 3500 1345 2420 2785 3025 1160
SKHH210L/R-2IF HSUR/LC210-2 14 3-1/16 8-1/2 2 20 16d 6 16d x 2-1/2 2800 3220 3500 1345 2420 2785 3025 1160
SKHH46L/R HSUR/L46 14 3-9/16 5-1/4 2-1/2 12 16d 6 16d 1680 1930 2100 1345 1450 1670 1815 1160
SKHH46L/RIF HSUR/LC46 14 3-9/16 5-1/4 2-1/2 12 16d 6 16d 1680 1930 2100 1345 1450 1670 1815 1160
SKHH410L/R HSUR/L410 14 3-9/16 8-1/2 2-1/2 20 16d 10 16d 2800 3220 3500 2240 2420 2785 3025 1935
SKHH410L/RIF HSUR/LC410 14 3-9/16 8-1/2 2-1/2 20 16d 10 16d 2800 3220 3500 2240 2420 2785 3025 1935
SKHH414L/R HSUR/L414 14 3-9/16 12-1/2 2-1/2 26 16d 10 16d 3640 4185 4550 2240 3145 3620 3935 1935
SKHH414L/RIF HSUR/LC414 14 3-9/16 12-1/2 2-1/2 26 16d 10 16d 3640 4185 4550 2240 3145 3620 3935 1935
1
)
U
p
lift loads have been increased 60% for wind and seismic loads; no further increase shall be
p
ermitted.
2
)
Minimum nail embedment shall be 1-1/2" for 10d nails and 1-5/8" for 16d nails.
3
)
NAILS: 16d nails are 0.162" dia. x 3-1/2" lon
g
, 16d x 2-1/2 nails are 0.162" dia. x 2-1/2" lon
g
.
*Miter cut re
q
uired on end of
j
oist to achieve desi
g
n loads.
New
p
roducts or u
p
dated
p
roduct information are desi
g
nated in blue font.
Code
Ref.
Dimensions (in)
Fastener Schedule
2,3
DF/SP
Allowable Loads (Lbs.)
S-P-F
Allowable Loads (Lbs.)
Corrosion
Finish
Header Joist
Beam/Joist
Size
USP
Stock No. Ga.
Roof Roof
130
(2) 2 x 6 - 8
(2) 2 x 10-14
4 x 6-8
4 x 10-14
4 x 14-18
SKH / SKHH Skewed 4 Hangers
KF – Fastens to joist ends quickly with nails.
PHG – Features a gripper design to hold the joist in place
with out nailing during the assembly process.
Materials: 18 gauge
Finish: G90 galvanizing
Codes: See page 11 for Code Reference Chart
Installation:
Use all specied fasteners. See Product Notes, page 17.
In panelized construction, installers are allowed to nail through
both the sheathing and the hanger top ange with (1) 10d nail.
The nail should be centered in the top ange and be no closer
than 1/4" from the back or front edge of the top ange.
Use locator window to center hanger on purlin center line.
KF & PHG – These hangers do not provide uplift resistance.
Typical KF installation
Typical PHG26 installation
KF
PHG26
KF / PHG Panel Hangers
Corrosion Finish
Stainless Steel Gold Coat
HDG Triple Zinc
Corrosion Finish Stainless Steel Gold Coat HDG Triple Zinc
Corrosion
Finish
Stainless Steel
Gold Coat
HDG
Triple Zinc
Continued on next page
SKHH210L-2SKHH210L SKHH46LIF
H
W
W
D
D
W
H
H
TF
TF
D
D
W
W
Locator
windows
Locator
windows
Hangers
D
H
W

Summary of content (2 pages)