Concrete & Masonry
Concrete & Masonry
MiTek
®
Product Catalog
FA Foundation Anchor
FA4 foundation anchors can be installed as a replacement for 5/8"
or 1/2" diameter anchor bolts while achieving the same load capacity.
Materials: 16 gauge
Finish: G90 galvanizing
Options: See chart for Corrosion Finish Options
Codes: See chart for code references
Installation:
The FA4 can be mounted to the form board before placing the concrete or
inserted into the wet concrete after it is poured. See Detail A installation.
Place the mudsill in position after the concrete cures. Secure the FA4 to the mudsill
(and stud, if applicable) by bending the anges as needed for a tight t and nailing
into place with the size and quantity of fasteners specied in the chart.
For installation in severe corrosion environments, see Corrosion Information on pages 11-16.
Type Concrete
3
Uncracked 905 1460 1070 655
Cracked 750 1225 750 585
Uncracked 780 955 1070 515
Cracked 750 955 755 515
Uncracked 1070 1130 -- --
Cracked 750 1130 -- --
Uncracked 1070 650 650 400
Cracked 750 650 650 400
Uncracked 875 1460 875 655
Cracked 655 1075 655 510
Uncracked 780 955 875 515
Cracked 655 955 655 510
Uncracked 875 1130 -- --
Cracked 655 1075 -- --
Uncracked 875 650 650 400
Cracked 655 650 650 400
1) Allowable loads have been increased 60% for wind and seismic loads; no further increase shall be permitted.
2) Allowable loads are based on a minimum stemwall thickness of 6", minimum distance from the end of the concrete
wall of 4" and minimum anchor spacing of 8".
3) Minimum concrete strength f'c = 2,500 psi.
4) NAILS: 10d x 1-1/2 nails are 0.148" dia. x 1-1/2" long.
Single
3x
Varies
Wind and ASCE Seismic Design A & B
ASCE Seismic Design C-F
FA4 MASA 16
--
Two-Tabs-Up
Sill Plate
F1
160%
F2
160%
F3
160%
9 -- -- 10d x 1-1/2
--5 4 10d x 1-1/2
36
Standard
--
FA4 MASA 16
Plate
Size
Single
2x
Code
Ref.
Standard
One-Tab-Up
--
10d x 1-1/2
Corrosion
Finish
Fastener Schedule
4
DF/SP
Allowable Loads (Lbs.)
1,2
Stud
QtyGA
MiTek
Stock No.
3
Side
Qty
Top
Qty
Uplift
160%
Installation
Type
333
Single
2x
33
Single
3x
Varies
5 4 --
----9
Ref.
No.
IBC,
FL,
LA
Standard
One-Tab-Up
--
10d x 1-1/2
3
IBC,
FL,
LA
Standard10d x 1-1/2
10d x 1-1/2 Two-Tabs-Up
6
Wind Wind
6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0"
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0"
6'-0" 5'-4" 5'-4" 5'-4" 5'-0" 5'-0" 5'-0"
4'-0" 3'-7" 3'-7" 3'-7" 3'-4" 3'-4" 3'-4"
1) Place anchors not more than 1'-0" from end of each mudsill per code.
2) Spacing is based on parallel to mudsill load direction only.
3) Concrete shall have a minimum f'c = 2,500 psi.
4) Spacing applies to a maximum of 1 in 4 FA4 Foundation Anchors being installed to mudsill and stud.
5) Spacing requirements are based on lateral load capacities of anchor bolts published in the 2018 NDS.
ASCE Seismic
Design C-E
ASCE Seismic
Design A & B
ASCE Seismic
Design C-E
Prescriptive Spacing To Replace 1/2" or 5/8" Diameter Anchor Bolts
1/2"
5/8"
Min
End
Distance
Min
C-C
Spacing
Anchor
Bolt
Diameter
Anchor
Bolt
Spacing
DF/SP
2x Mudsill O.C. Spacing
Hem-Fir
2x Mudsill O.C. Spacing
5-1/2" 7-1/4"
5-1/2" 7-1/4"
ASCE Seismic
Design A & B
Corrosion Finish
Stainless Steel Gold Coat
HDG Triple Zinc
Corrosion Finish Stainless Steel Gold Coat HDG Triple Zinc
Corrosion
Finish
Stainless Steel
Gold Coat
HDG
Triple Zinc
1) Place anchors not more than 1'-0" from end of each mudsill per code.
2) Spacing is based on parallel to mudsill load direction only.
3) Concrete shall have a minimum f'c = 2,500 psi.
4) Spacing applies to a maximum of 1 in 4 FA4 Foundation Anchors being
installed to mudsill and stud.
5) Spacing requirements are based on lateral load capacities of anchor
bolts published in the 2018 NDS.
1) Allowable loads have been increased 60%
for wind and seismic loads; no further
increase shall be permitted.
2) Allowable loads are based on a minimum
stemwall thickness of 6", minimum distance
from the end of the concrete wall of 4" and
minimum anchor spacing of 8".
3) Minimum concrete strength f'c = 2,500 psi.
4) NAILS: 10d x 1-1/2 nails are
0.148" dia. x 1-1/2" long.
Typical FA4 one-tab-up
installation
Typical FA4 standard
installation
Prescriptive Spacing to Replace 1/2" or 5/8" Diameter Bolts
3-1/2"
4-1/8"
FA4
5-3/16"
Typical FA4 form board
installation
Detail A
Detail B
Form
board
Duplex
nails
FA4
Install FA4 with
Tab against form
board to maintain
proper angle of
embedment
Form board
FA4
3-5/8"
Duplex nail
F1
F1
F3
F2
Uplift