User`s manual

25
Dimensions
All measurements in mm.
Notes:
(1) The unit must be fixed with anchor bolts.
(2) Leave a 2m or larger space above the unit.
(3) The unit name plate is attached on the lower right corner of
the front panel.
(4) The ports for refrigerant pipe and power cable penetrations
are covered with half-blanks. Please cut off a half-blank with
nippers in using these ports.
(5) Use a ø88 port for refrigerant pipe connection.
(6) Anchor holes marked “L J” (four holes for M10) are for a
renewal installation.
(7) The oil-equalising pipe K should be used when outdoor units
are used in combination.
K
B
A
Dimensions of refrigerant
pipe connection (plan)
142.5
234
75
140.5
95
141
Rear
Anchor bolt positions for F, J
Anchor bolt positions for I
250 250850
1000
175 175
19 19
58.5
58.5
647
726
F
F
FIFI
J
I
J
I
J
J
Air intake
C
D(lower)
232
101
232
74.5
59485
57
85
410 235530
342352
148 158
140
120
22
720
22
240
174
295
296.7
80.5
71
G
G
G
H
185185185
Drain pipe
80
175
720
D (left)
6
84
B
A
166
211
169
259
291.6
86.1
104.9
K
6
1350
126.2
Signal wire
terminal block
Terminal block
for power cable
connection
7-segment display
inspection port
D (front)
C (front)
682
1155.8
2048
Instruction plate
95
172
90
C (right)
D (right)
44.7
172
550
86.5
180
220
20
214
180
C (rear)
L
Mark Item
A
B
C
D
F
G
H
K
L
Service valve connection (gas side)
Service valve connection (liquid line)
Refrigerant pipe draw-out port
Power cable draw-in port
Anchor bolt hole
Drain hose hole
Drain discharge port
Oil-equalising pipe joint
Sling holes for haulage or hoisting
ø100
ø50
M10 x 4 places
ø45.3 x 3 places
ø20.5 x 3 places
ø9.52 flare
180 x 44.7
For refrigerant piping, please
refer to the unit specifications.