Dismantling Guide
9. When moving the removed Main drive li-ion battery
with a crane or other machine, use the EV battery
sling tool kit (special tool: MB992343) to sling it up in
accordance with the following procedure.
• EV battery sling tool kit (MB992343)
• Eye bolts (MB992344 x 4)
• EV battery sling belt
s (MB992345 x 2)
• Wa
shers (MF450156 x 8)
• Hexagon nuts (MU001480 x 4)
NOTE: For instructions how to use the EV battery
sling belt, refer to the provided "Operation Manual".
(1) Mark the center of the EV battery sling belt
(MB992345) and positions 275 mm right and
left from the center.
NOTE: The marking is intended for alignment
of the EV battery sling belt and eye bo
lt.
(2) Install the eye bolts (MB992
344), washers
(MF450156) and nuts (MU001480) onto the
positions (2 each at the right and left) on the
Main drive li-ion b
attery as shown in the figure.
(3) Pass the EV battery sling belt through the eye
bolts and align the marks on the EV battery
sling belt to the eye bolt positions.
(4) Bind 2 EV battery sling belts together and sling
up the Main drive li-ion
battery with a crane or
other machine.
AC902209
AB
Center
275 mm275 mm
AC902210
AB
AC902396
AB
AC902235
23