Specifications
ENGINE <4G9-GDI> – Cylinder Head Gasket
11A-25
CYLINDER HEAD GASKET
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
D Fuel Discharge Prevention (Refer to GROUP 13A
– On-vehicle Service.) <Pre-removal only>
D Engine Coolant Draining and Supplying (Refer to
GROUP 14 – On-vehicle Service.)
D Engine Oil Draining and Supplying (Refer to GROUP
12 – On-vehicle Service.)
D Intake Manifold Removal and Installation (Refer to
GROUP 15.)
D Fuel Pressure Regulator (High Pressure) and Fuel
Pump (High Pressure) Removal and Installation
(Refer to GROUP 13A.)
D Water Bypass Pipe Assembly Removal and
Installation (Refer to GROUP 14 – Water Hose and
Pipe.)
D Timing Belt Removal and Installation (Refer to
P.11A-29.)
1
8
2
3
4
5
6
7
9
78 Nm → 0 Nm → 20 Nm
→ +90_ → +90_
3.4 Nm
22 Nm
10–12 Nm
1
0
11
12
13
35 Nm
44 Nm
26 Nm
44 Nm
10–12 Nm
Removal steps
1. Radiator upper hose connection
2. Idler pulley
3. Timing belt rear cover, upper (LH)
4. Timing belt rear cover, lower (RH)
5. Timing belt rear cover, upper (RH)
6. Earth cable connection
7. Rocker cover assembly
8. Tension Pulley
AA" 9. Power steering oil pump and brack-
et assembly
10. Heater hose connection
AB""BA11. Cylinder head bolt
12. Cylinder head assembly
"AA 13. Cylinder head gasket