Specifications
ENGINE <4G9-GDI> – Engine Assembly
11A-33
ENGINE ASSEMBLY
REMOVAL AND INSTALLATION
Caution
Mounting locations marked by * should be provisionally tightened, and then fully tightened after
placing the vehicle horizontally and loading the full weight of the engine on the vehicle body.
Pre-removal and Post-installation Operation
D Fuel Discharge Prevention (Refer to GROUP 13A
– On-vehicle Service.) <Pre-removal only>
D Engine Coolant Draining and Supplying (Refer to
GROUP 14 – On-vehicle Service.)
D Engine Oil Draining and Supplying (Refer to GROUP
12 – On-vehicle Service.)
D Hood Removal and Installation (Refer to GROUP 42.)
D Radiator Assembly Removal and Installation (Refer
to GROUP 14.)
D Air Cleaner and Resonance Tank Removal and
Installation (Refer to GROUP 15.)
D Transmission Assembly Removal and Installation
(Refer to GROUP 23.)
D Drive Belt Tension Adjustment (Refer to P.11A-7.)
<Post-installation only>
2
3
4
5
6
7
8
9
11
10
12
5 Nm
15
13
4
1
5 Nm
25 Nm*
28 Nm
28 Nm
18 Nm
1
14
Removal steps
1. Engine harness connector
2. Earth cable connection
3. Brake booster vacuum hose
connection
4. Vacuum hose connection
5. Battery cable connection
6. A/T fluid pipe clamp
7. Steering gear box and shaft
connection
8. Drive belt
AA" 9. Power steering oil pump
AB" 10. A/C compressor
11. Fuel return hose connection
12. Fuel pressure hose connection
13. Heater hose connection
14. Engine mount installation nut
AC""AA15. Engine assembly