Specifications

ENGINE <4G9> Camshaft and Camshaft Oil Seal
11A-4
CAMSHAFT AND CAMSHAFT OIL SEAL
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operations
Fuel Overflow Prevention Operation <only for pre-removal>
Fuel Leak Check <only for post-installation>
Air Bleeding The High-pressure Fuel Line <only for post-installation>
[Refer to GROUP 13A Fuel Pump (High-pressure).]
Removal and Installation of Under Cover
Check and Adjustment of Drive Belt Tension <only for post-installation>
Draining and Filling of Engine Coolant
Removal and Installation of Air Intake Hose and Resonance Tank