Specifications

Gravimetric Batch Blenders w/Mitsubishi Control Chapter 5: Maintenance 67
Chapter 5: Maintenance
5-1 Preventative Maintenance Schedule
The mechanical design of the blender is very simple and very little maintenance is required.
The only moving parts are the metering gates, weigh hopper dump valve and mixer agitator.
The checklist below contains a list of items which should be inspected and/or replaced to
keep your blender operating at peak efficiency. Perform each inspection at the regular
intervals listed below.
System model #
Serial #
Daily
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect blender for
any loose parts-
tighten them
immediately.
Verify quality of
compressed air
supply.
Verify mixer door is
properly latched.
Every week
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect metering
gates for proper
operation.
Check to make
sure that all hose
connections are
air tight.
Every month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Inspect air
regulator and air
safety circuits, if
equipped.
Recalibrate blender
only If necessary.
- Photocopy this page for your maintenance records -