Service manual

43
OPERATING PROCEDURE
PHOTOS & ILLUSTRATIONS
10 Removing the drain pump (DP) and float switch (FS)
(1) Remove the drain pan. (See Photo 6)
(2) Cut the hose band and remove the hose.
(3) Remove the drain pump assembly (3 screws and 2 hooks).
(4) Remove the drain pump (3 screws).
(5) Remove the float switch (2 screws).
Photo 8
Photo 9
Drain pump
Hose band
Float switch
Drain pump assembly
fixing screws
Drain pump
fixing screws
Float switch
fixing screws
11. Removing the heat exchanger
(1) Remove the drain pan. (See Photo 6)
(2) Remove the 3 screws of the piping cover, and pull out
piping cover.
(3) Remove the 2 screws of coil plate.
(4) Remove the 2 screws of the coil.
(5) Remove the screw of the coil support.
(6) Pull out the heat exchanger.
Photo 10
Linear expansion
valve
Heat exchanger
fixing screws
Coil support
Heat exchanger
Piping cover
OCH413D