User`s manual

11 - 31
MELSEC-Q
11. USEFUL FUNCTIONS
11.8.2 Wave trace execution
PURPOSE
Execute wave trace after setting the trace conditions in accordance with Section
11.8.1.
BASIC OPERATION
1. Perform the basic operation in Section 11.8.1 to set the trace conditions.
2. Click the "Trace" button to initialize the QD75.
3. When initialization is completed, click the "Start" button in the dialog box.
4. The trace data is read when the trace stop type condition is satisfied or the
"Stop" button is clicked.
5. Check the QD75 control results from the displayed trace results.
DISPLAY/SETTING SCREEN