User`s manual

1 - 7
MELSEC-Q
1. OVERVIEW
(From the preceding page)
Step 5: Set and write data to the positioning module. Refer To
• Set the parameters appropriate for the positioning system and control.
• Set the positioning data and M code comments.
• Check the positioning data on the simulation screen.
• Make the corresponding setting if block start data and/or condition data is required.
• Make error check to check the parameters, positioning data and block start data settings.
Chapter 8
Write, read or verity the set data on the project. Chapter 9
Step 6: Perform test operation and check and adjust the settings. Refer To
• Make online error check to recheck the settings of the parameters, positioning data and block
start data written to the QD75.
• Check positioning control and test on the monitor screen.
• Set the positioning data and block start data, and perform test operation.
• Make present value change test, speed change test, OPR test, JOG operation test and MPG
operation test to check the parameters, addresses, axis speeds, etc.
Chapter 10
Step 7: Positioning system operation Refer To
• Operate the positioning system with the PLC CPU program.
QD75 User's
Manual