Specifications

4
4.INSTALLATION
4– 3
(2) Installation direction and clearances
1) Installation of one servo amplifier
2) Installation of two or more servo amplifiers
Leave a large clearance between the top of the servo amplifier and the internal surface of
the control box, and install a fan to prevent the internal temperature of the control box from
exceeding the environmental conditions.
MR J2
Control box Control box
10mm
(0.4 in.)
or more
10mm
(0.4 in.)
or more
40mm
(1.6 in.)
or more
40mm
(1.6 in.)
or more
Wiring clearance
70mm
(2.8 in.)
Top
Bottom
MR J2
Control box
30mm
(1.2 in.)
or more
30mm
(1.2 in.)
or more
10mm
(0.4 in.)
or more
40mm
(1.6 in.)
or more
100mm
(4.0 in.)
or more