Engineering Manual

A-63
SUZ-KA09NA SUZ-KA12NA SUZ-KA15NA
Liquid pipe :1/4 (flared)
Gas pipe :3/8 (flared) (KA09/12)
1/2 (flared) (KA15)
6-23/32
2
5-7/8
2-23/32
1-3/4
15-3/4
12 ~ 12-3/4
13-9/16
11/16
1-9/16
7/8
21-5/8
11-1/32
13/32
31-1/2
19-11/16
5-15/16
11-29/32
17/3229/32 11-1/4
Air in
handle
Air in
Air out
2- 3/8 13/16 Oval hole
Drain hole 1-5/8
REQUIRED SPACE
Basically open 4 in. or more
without any obstruction in front
and on both sides of the unit.
14 in. or more
8 in. or more
4 in. or more
4 in. or more
Open two sides of left,
right, or rear side.
SUZ-KA18NA
20-9/32
14-3/16
Air in
11-25/32
2-19/32
Air in
Air out
19-11/16
33-1/16
13
2
4-25/32
33-7/16
16-15/16
3-3/16
4-3/8
×
13/16 slot
1-11/32
1-9/16
Drain 3 holes
(ø1
-5/16)
30°
35°
2-9/16
Liquid:1/4(flared)
Gas :1/2(flared)
3-9/16
8-11/32
15-9/16
Open as a rule
20 in. or more
if the front and both sides
are open
4 in. or more/ 8 in. or more
if there are obstacles
to both sides
Open as a rule
20 in. or more if the back,
both sides and top are open
REQUIRED SPACE
14 in. or more
4 in. or more
Unit: inch