Operating instructions

2. If the length is zero enter the number of metres
just loaded.
3. Use the mouse to click on the Load button in
order to start the inlet roller drive motor.
4.
Press YES to LOAD the material.
5.
Press OK button to save the changes.
The rolls in the magazine which are about to be
loaded will now start running. They will run for 30
seconds which allows the operator plenty of time
to align the material.
6. Remove the white tape from the roll and posi-
tion the leading edge of the roll at the nip of the
inlet rollers at the bottom of the magazine.
Guide the leading edge of the roll into the nip
of the feed rollers. When the plate starts feed-
ing into the inlet rollers, close the magazine
cover and the lid.
If removing the tape and aligning the material
takes more than 30 seconds, just click the LOAD
button once again.
The emulsion side is matt and dark and faces
downwards on the roll. It is important that the
front edge of the plate material is not folded or
creased and that all tape has been carefully re-
moved.
If length (M) is zero, the lenght of the material
should be specified, otherwise the loading process
will generate an error.
Wait for the material to load.
When a new roll has been fitted, the first 2-3 plates
cannot be used because of possible fogging during
installation.
Page 11
DPX System - Operating Instructions Changing Plate Material
555 Theodore Fremd Ave., Rye, NY 10580 • 914-925-3261 • http://techsupport.mitsubishiimaging.com