Extra Information

EN-17
6. Schedule setting
<Note>
• ThepowersupplyONandthepowersupplyOFFcannotbeselectedatthesametimeofthesamedayofthe
week.
• TheScheduleSettingwillbeexecutedwhile“ProjectorViewGlobal+”isinoperation.
• Dependingonusageconditions,suchaswhentherearesomanyprojectorsthatyouneedtocontrol,thetime
tobeexecutedbythepowersupplycontrolmaydeviatefromthesettingtimeoftheschedule.
• WhenutilizingtheNetworkTimeProtocol(NTP)functionontheInternet,thescheduleoperationmaynotbe
executedbecausethesettingtimeoftheschedulejumpsover.
• Whentheautomatictimeadjustmentbysummertimeisvalid,thescheduleoperationmaynotbeexecuted
because the time is automatically adjusted before and after switching over.
6.2. When changing schedule setting
(1) Select a group which you like to change from the Group select pull-down menu on the main
screen.
(2) Select “Edit Schedule Setting” from “Configuration” of the menu bar.
• “EditScheduleSetting”windowisdisplayed.
(3) Change the contents which you like to correct, and click [Save].
• Correctedcontentsarereected.