I&O Manual

DEKA DURATION DD5300
13
General Preparation
Before Installation:
Ensure that all the modules are turned OFF.
Battery installation location should be at least 20m away from sources of heat, sparks or other sources of extreme
temperature. Battery connecting cables shall be as short as possible to prevent excessive voltage drops.
Batteries with different capacity, different type/model or design or from different manufacturers shall not be connected together.
1.
Before connecting the battery, the battery positive and negative poles shall be carefully
checked to ensure correct installation.
2.
The installation location must be on a flat level surface, in a dry, clean and protected room,
away from water and humidity.
The mechanical installation method for the Deka Duration DD5300 Battery Modules can be
considered “conceptually’’ the same for HV and LV configurations.
Before starting any operation on the battery, make sure to position the modules in their final position
and structurally fix all the modules that make up the system.
The installer who intends to install the Deka Duration DD5300 Battery Module in the HV
configuration should read this entire manual including the HV configuration information defined in
Section 3.