2.7.3 LV Direct Parallel Connection WITHOUT Certified Inverter BMS Communication (Open-Loop)
It is recommended to always use an inverter equipped with CAN communication as listed in this manual,
however any inverter can be used with Deka Duration batteries by setting the voltage and current values
according to the table below.
Note that for installations WITHOUT certified Inverter BMS Communications, the maximum number
of battery modules per installation is limited to five in parallel (5). The DD21001 Low Voltage Hub
must not be used without Certified Inverter BMS Communication.
LV/HV DD5300
Individual Module Setting
Nominal DC Voltage
52
Nominal Amp Hours
105 / Usable 100Ah
Rated kWh Capacity
5.3 kWh
Standard Charge Current
100 Adc
Max Charge Current
110 Adc Peak
Standard Discharging Current
100 Adc
Max Discharging Current
200 Adc Peak 5 sec
Min Voltage
50.5 Vdc
Max Voltage
56.00 Vdc
Warranty Terms Charge Current
50 Adc @ 77°F (25°C) 80% DoD
Warranty Terms Discharge Current
50 Adc @ 77°F (25°C) 80% DoD
Charging Current at Various Vdc at
77°F (25°C)
From 50.5 Vdc up to 54.2 Vdc
Max 100A
From 54.5 Vdc up to 56.0 Vdc
Max 10A
Operative Ambient Temperatures
Without CAN Communication
From +50°F to +95°F (+10°C to +35°C)
Operating Efficiency
98%
Self-Discharge Rate
1% self-discharge per month @ 77°F (25°C)
Memory Effect
None
Performance Warranty Period
10 Years see Limited Warranty terms
Note
Without CAN communication, it is not always possible to perform a
correct calibration of the cells due to the lack of interaction with the
inverter. It is therefore possible that the SoC 100% threshold is not
reached.
It is recommended to use the minimum and maximum settings
indicated, and to monitor the charging process to ensure that the
battery does not go into protection mode for Low or High Voltage,