2.9 CAN HUB for Multi Cluster Configuration
Required for installations of more than 1 cluster
DD21001 LOW VOLTAGE HUB
SEE THE POWER/CURRENT CONFIGURATION
SET THE INVERTER POWER AS PER THE CABLES CAPABILITIES
Each battery pack and each cluster must have the same Voltage and Firmware.
All stack configurations must use the Deka Duration Bus Bar.
Each cluster must have the same number of Battery Modules.
This BMS BMU Master Hub is mandatory when more than one cluster is connected on a
common bus bar.
The Master HUB works only with CAN communication approved inverters.