User guide

28
MK-1280 GAS SAW MAINTENANCE
MICRO-V BELT INSPECTION, ADJUSTMENT AND REPLACEMENT
NOTE:
When a new belt is installed, it should be inspected and re-tensioned after the
rst forty-eight (48) hours of operation.
MICRO-V BELT
Fig. A
Remove Outer Belt Guard
Fig. B
Check Belt tension
Fig. C
To change tension loosen all
four engine mount bolts
Fig. D
Tighten or loosen belt tension
as required
Fig. E
Tighten Engine mount bolts
Fig. F
Replace outer Belt Guard
COOLING FLOW
“Rodding” cooling channels is performed by removing the ow control valve and then inserting a
small wire rod through the cooling channel inlet, on the top of the Blade Guard and directing the rod
out through each of the diamond blade cooling ow outlet ports, located on the underside of the Blade
Guard. The cooling channels should be “rodded” until each of the outlet ports are open and free of
foreign debris.