Installation Guide

Barn Door Hardware Kit
ASSEMBLY INSTRUCTIONS
BARN DOOR HARDWARE KIT
ASSEMBLY INSTRUCTIONS
Step 7. DRYWALL Wall Preparation
When installing into drywall, a piece of 1" x 4" solid wood
blocking is required to be mounted to the wall before
proceeding with the rail installation.
Position the solid wood blocking by measuring up from
the door height (H) + 1 3/4" to the center of the track. Also
ensure a gap of 3/8" at the bottom. Lastly, ensure the solid
wood blocking is level and leave a minimum of 2" from the
end of the blocking to the side of the opening (as shown).
If installing with an opening for 80" standard door size,
remove the top trim and cut the side trim horizontally along
the height of the opening.
Step 8. DRYWALL Wall Preparation
Position the rail on top of the wood blocking ensuring
levelness, mark the holes using a pencil and pre-drill
5/16" holes into the wood blocking.
1 3/8" (30 mm)
5/16" (8mm)
Step 9. DRYWALL Rail Installation
When installing into the solid wood block and wall, insert
using the provided wall anchors and wall screws. Align each
spacer to the rail holes, inserting anchors, spacers and bolts
(with washers), securing with a wrench.
Ensure to insert both stoppers either side of the rail inside
Door Height + 1 3/4"
1” x 4” solid wood blocking
78 3/4" (2000 mm)
Minimum
2"
(51mm)
3/8" (9.5 mm)
Gap under
the door
®
www.millikenmillwork.com
Step 7. DRYWALL Wall Preparation
When installing into drywall, a piece of 1" x 4" solid wood blocking is required
to be mounted to the wall before proceeding with the rail installation.
Position the solid wood blocking by measuring up from the door height (H)
+ 1 3/4" to the center of the track. Also ensure a gap of 3/8" at the bottom.
Lastly, ensure the solid wood blocking is level and leave a minimum 2" from
the end of the blocking to the side of the opening (as shown).
If installing with an opening for 80" standard door size, remove the top trim
and cut the side trim horizontally along the height of the opening.
Image for bent strap shown
BARN DOOR HARDWARE KIT
ASSEMBLY INSTRUCTIONS
Step 7. DRYWALL Wall Preparation
When installing into drywall, a piece of 1" x 4" solid wood
blocking is required to be mounted to the wall before
proceeding with the rail installation.
Position the solid wood blocking by measuring up from
the door height (H) + 1 3/4" to the center of the track. Also
ensure a gap of 3/8" at the bottom. Lastly, ensure the solid
wood blocking is level and leave a minimum of 2" from the
end of the blocking to the side of the opening (as shown).
If installing with an opening for 80" standard door size,
remove the top trim and cut the side trim horizontally along
the height of the opening.
Step 8. DRYWALL Wall Preparation
Position the rail on top of the wood blocking ensuring
levelness, mark the holes using a pencil and pre-drill
5/16" holes into the wood blocking.
1 3/8" (30 mm)
5/16" (8mm)
Step 9. DRYWALL Rail Installation
When installing into the solid wood block and wall, insert
using the provided wall anchors and wall screws. Align each
spacer to the rail holes, inserting anchors, spacers and bolts
(with washers), securing with a wrench.
Ensure to insert both stoppers either side of the rail inside
Door Height + 1 3/4"
1” x 4” solid wood blocking
78 3/4" (2000 mm)
Minimum
2"
(51mm)
3/8" (9.5 mm)
Gap under
the door
®
www.millikenmillwork.com
Step 8. DRYWALL Wall Preparation
Position the rail on top of the wood blocking ensuring levelness, mark the
holes using a pencil and pre-drill 5/16" holes into the wood blocking.
Step 9. DRYWALL Rail Installation
When installing into the solid wood block and wall, insert using the
provided wall screws. Align each spacer to the rail holes, inserting spacers
and screws with a wrench.
Ensure to insert both stoppers on either side of the rail inside the rst hole.