Warranty

NATURAL GAS CONVERSION INSTRUCTION
9
1
2
Slip sleeve over the end of burner tube and cover the LP primary air hole,
then screw it.
Find the new NG orifice spud, verify it is the correct size, the sign 3.1mm
should be on the side of the orifice spud.
Screw the new NG orifice spud into Burner tube.
Re-attach bellows to the NG orifice spud.
Bellows
NG Orifice Spud
Burner Tube
1
2
8 / 40
LP Primary Air Hole
sleeve
10
After
3.1