Installation and Service Manual

M
M
odel PTS
w
1. Disconnec
t
connectio
n
damage.
2.
All applian
c
the wiring
d
wiring diff
e
a hazard t
o
3. Any origin
a
must be re
temperatu
r
4. Ensure th
a
indicated
o
voltage by
Ensure that t
h
indicated on t
h
by more than
PLEASE
B
w
ith Transfor
W
A
R
t
power suppl
y
n
s to prevent el
c
es must be w
d
iagram furnis
h
e
rent from the
w
o
persons and
a
l factory wirin
g
placed with wi
r
r
e rating of at l
e
a
t the supply v
o
o
n the serial pl
a
more than 5%
CAU
h
e supply volta
g
h
e serial plate,
5%.
THIS M
B
E SURE TO
mer Access
o
R
NING
y
before makin
g
ectrical shock
i
red strictly in
a
h
ed with the a
p
w
iring diagram
property.
g
that requires
r
ing material h
a
e
ast 105°C.
o
ltage to the a
p
a
te, is not over
.
TION
g
e to the appli
a
is not under t
h
A
NUAL IS T
H
LE
A
VE IT W
o
ry Mounte
d
g
wiring
and equipmen
a
ccordance wit
p
pliance. Any
could result in
replacement
a
ving a
p
pliance, as
the rated
a
nce, as
h
e rated voltag
e
mode
l
H
E PROPER
T
ITH THE O
W
d
t
h
e
1.
T
q
a
q
2.
T
w
s
t
l
Mo
All
H
pro
p
can
pow
e
115
V
If th
e
115
V
volt
a
For
B
gre
a
mot
o
exh
a
rem
a
tran
s
INST
A
l
s HD/HD
B
T
Y OF THE
O
W
NER WHEN
I
M
T
he use of thi
s
q
ualified instal
l
a
nd service of
q
ualified instal
l
T
hese instructi
w
ith the Install
a
s
hipped with t
h
t
o an
y
other a
c
l
iterature.
del Appli
c
H
D/HDB, HDS/
H
p
eller and blow
e
be wired for 1
1
e
r exhauster
m
V
to 24V facto
r
e
units are to b
V
, a field instal
l
a
ge to 115V is
B
TS models,
w
a
ter than 115V,
o
r that matche
s
a
uster motor a
n
a
in as 115V, r
e
s
former.
A
LLATIO
step-
B
, HDS/HD
C
O
WNER.
YOU LEAV
E
M
POR
T
s
manual is sp
e
l
ation and ser
v
these kits mu
s
l
ation and ser
v
i
ons must also
a
tion and Serv
h
e appliance b
e
c
companying c
c
ation
HDC, PTS, an
d
e
r motors (exc
1
5V or 230V si
n
m
otor is 115V.
r
y installed tra
n
b
e used with a
s
l
ed step-down
required.
w
hen specified
the unit can b
s
the supply v
o
n
d control circ
u
e
quiring a field
6
F
N INSTR
U
down tran
C
, PTS/BT
S
E
THE JOB.
T
ANT
e
cifically inten
d
v
ice agency. A
s
t be performe
d
v
ice agency.
be used in co
n
ice manual ori
g
e
ing converted
omponent sup
d
PTC models
ept PTS400 si
z
n
gle phase).
A
Units come st
a
n
sformer for th
e
s
upply voltage
transformer fr
o
for use on a s
u
e configured
w
o
ltage. Howev
e
u
it step-down t
r
installed step-
d
6
-567.2
5H080455
A
F
ebruary, 201
2
U
CTION
S
sformer ki
S
, and PT
C
d
ed for a
ll installation
d
by a
n
junction
g
inally
, in addition
plier
utilize 115V
z
e units, whic
h
A
dditionally, th
e
a
ndard with a
e
control circui
t
greater than
o
m the supply
u
pply voltage
w
ith a blower
e
r, the power
r
ansformer
d
own
2
S
t
C
e
t
.

Summary of content (4 pages)