C1.  This section applies to horizontally vented 2-pipe vent 
systems (one combustion air inlet pipe and one vent 
pipe) and is in addition to “Section A – General 
Instructions – All Units”. Category III vent systems listed 
by a nationally recognized agency and matching the 
diameters specified may be used. Different brands of 
vent pipe materials may not be intermixed. 
Under no 
circumstances should two sections of double wall vent pipe 
be joined together within one horizontal vent system due to 
the inability to verify complete seal of inner pipes.
C2. Horizontal vent systems terminate horizontally 
(sideways).
C3.  All horizontal vents must be terminated with a listed vent 
cap. The cap must terminate a minimum distance from 
the external wall, as summarized in Figure 9.1.
C4
.  The termination of horizontally vented system must 
extend 16" beyond the exterior surface of an exterior 
wall.
C5
.  The combustion air pipe must be a minimum of 6" below 
the vent pipe, and 4" from the exterior wall.
C6.  Construct the vent system as shown in Figure 9.1.
C7
.  When horizontal vents pass through a combustible wall 
(up to 22" thick), the vent passage must be constructed 
and insulated as shown in Figure 9.2.
C8.  The vent must be supported as shown in Figure 9.2.
C9.  When condensation may be a problem, the vent system 
shall not terminate over public walkways or over an area 
where condensate or vapor could create a nuisance or 
hazard or could be detrimental to the operation of 
regulators, relief openings, or other equipment. 
C10. Maintain a 1/4" per foot downward slope away from the 
heater and place a drip leg with clean out near the exit of 
the vent as shown in Figure 9.1, or allow the condensate 
to drip out the end.
C11.   For a vent termination located under an eave, the 
distance of the overhang must not exceed 24". The 
clearance to combustibles above the exterior vent must 
be maintained at a minimum of 12". Consult the National 
Fuel Gas Code for additional requirements for eaves that 
have ventilation openings.
C12.  Once venting is complete, proceed to section titled 
“Installation – Gas Connections”.
INSTALLATION - VENTING
METAL
SLEEVE
FIBER GLASS
INSULATION
MIN. 2"
2" MIN.
VENT TERMINATION
SUPPORT BRACKET
(where required)
(Make from 1" x 1" steel angle)
9"
9"
45
1"
METAL
SLEEVE
2" MIN.
VENT PIPE
DIAMETER
METAL FACE
PLATE
1"
Figure 9.2 - Exhaust Vent Construction Through 
Combustible Walls and Support Bracket
Figure 9.1 - Horizontal Venting with Downward Pitch
COMBUSTION AIR 
EXHAUST 
 SLOPE 1/4" PER FOOT 
 DOWNWARD FROM UNIT 
TEE WITH DRIP LEG AND 
CLEANOUT CAP AT LOW 
POINT OF VENT SYSTEM 
LISTED
TERMINAL
SUPPORT BRACKET 
6" MIN 
2' MIN 
 4" MIN 
 12" 