Troubleshoot

HEATING SEQUENCE OF OPERATION
Call for heat
T stat contact close T stat on terminals R & W of board
24 volts from R to W terminal on board
Power exhauster cycles on. 115 VAC at IND and Neutral on board.
Starts pre purge cycle
24 volts through limits and pressure switch from board
Short delay and then 24 volts to gas valve from board
Igniter sparks
Flames carries to sensing probe and proves
Yellow light turns on, burner stays lit.
50 to 60 seconds later, fan motor cycles on.
115 volts at EAC and Neutral terminals.
Back Start Over