IPT Installation Manual

9
9-511.4
INSTALLATION
Figure 9.1 - U-Tube System Suspension
Table 9.1 - U-Tube Chain Spacing
Ref # Part Description
1 Burner (installed In later steps)
2 Turbulator Baffle
3 Chain & “S” Hooks
4 Radiant Tube
5 DBL Tube & Reflector Hanger w/ Reinforcing Bar
6 Tube Clamp
7 Double Tube & Reflector Hanger
8 U-Tube
9 Self-Tapping Sheet Metal Screws
“A” Dimension is spacing from the tube system ends to the first hanger and from the U-tube ends to the last hanger.
“B” Dimension is spacing between first and second hangers away from burner.
“C” Dimension is spacing between hangers for tubes between “B” and “D” dimensions.
“D” Dimension is spacing between first and second hangers away from U-tube.
Tube System
Length (ft)
Number of
Chains
Maximum
Chain
Length
Espacement des chaînes
"A"
Dimension
"B"
Dimension
"C"
Dimension
"D"
Dimension
20 4
18" 6"
N/A
N/A
Sans objet
30 6
9' 4"
4' 4"
40 6 4' 4"
50 8
9' 8"
4' 4"
60 8 4' 4"
70 10 4' 4"