IPT Installation Manual
9
9-511.4
INSTALLATION
Figure 9.1 - U-Tube System Suspension
Table 9.1 - U-Tube Chain Spacing
Ref # Part Description
1 Burner (installed In later steps)
2 Turbulator Baffle
3 Chain & “S” Hooks
4 Radiant Tube
5 DBL Tube & Reflector Hanger w/ Reinforcing Bar
6 Tube Clamp
7 Double Tube & Reflector Hanger
8 U-Tube
9 Self-Tapping Sheet Metal Screws
➀ “A” Dimension is spacing from the tube system ends to the first hanger and from the U-tube ends to the last hanger.
➁ “B” Dimension is spacing between first and second hangers away from burner.
➂ “C” Dimension is spacing between hangers for tubes between “B” and “D” dimensions.
➃ “D” Dimension is spacing between first and second hangers away from U-tube.
Tube System
Length (ft)
Number of
Chains
Maximum
Chain
Length
Espacement des chaînes
"A"
Dimension ①
"B"
Dimension ②
"C"
Dimension ③
"D"
Dimension ④
20 4
18" 6"
N/A
N/A
Sans objet
30 6
9' 4"
4' 4"
40 6 4' 4"
50 8
9' 8"
4' 4"
60 8 4' 4"
70 10 4' 4"