Specifications
Operating the Machine
TX,35,JC1049 –19–17JAN96–2/4
T7747BC –UN–19MAY92
4. Raise and curl bucket to hold load.
TX,35,JC1049 –19–17JAN96–3/4
T7208AR –UN–30JAN90
EXCAVATING ON THE LEVEL: Position bucket at a
slightly downward angle on ground (use bucket teeth for
this type of digging).
TX,35,JC1049 –19–17JAN96–4/4
T7747BD –UN–19MAY92
IMPORTANT: Prevent possible damage to the
bellcrank linkage. DO NOT bulldoze with
bucket in dump position. When dozing,
keep bucket bottom parallel to the
ground.
DOZING: With bucket parallel to ground, remove as little
dirt as possible from the top surface. Let dirt spill from
partially dumped bucket to fill in low spots.
USING BOOM IN FLOAT POSITION: Place the boom in
float position and bucket in return-to-dig position to
prevent gouging the surface, as in cleaning concrete and
snow removal. Also use float position to avoid mixing
surface material with stockpile material.
DIGGING IN HARD, DENSE, OR TIGHTLY-PACKED
MATERIAL: To break material loose, use a gentle up-
and-down motion of the bucket.
35–11
PN=82