Installation Instructions
TYPICAL TROWEL AND APPROXIMATE COVERAGE* 
3/16” x 1/4” x ½” V-notch trowel: 50 to 65 square ft. per gallon. 
*Coverage is based on application to a clean, smooth concrete substrate; therefore, 
application rate may vary depending on substrate conditions 
NOTE: Do not apply over self-stick tile, sheet vinyl, old adhesives, metal, linoleum, 
laminate, particleboard or strip wood sub-floors without first covering with an 
approved wood or wood composite underlayment. Air temperature must be between 
50 F and 100 F for applying ProTack M908/WUA2 Urethane Adhesive. 
•  Product must be used in its entirety when opened. Lid cannot be re-sealed. 
•   Temperature and humidity will affect the curing time. The higher the temperature 
and humidity, the faster the cure. 
APPLICATION 
1. Regulate temperature and humidity 72 hours before, during and after installation. 
2. Spread adhesive using recommended trowel, ensuring 95 –  100% 
adhesive contact. 
Wet-lay method: Press flooring firmly into adhesive immediately after troweling. 
Walk-on method: Press flooring firmly into adhesive after it has developed 
its initial grab (typically, after 15 to 20 minutes). 
3. Remove any adhesive smudges or drops immediately as adhesive is very difficult 
to remove once allowed to dry. Clean tools while adhesive is fresh using a 
urethane adhesive remover or mineral spirits. 
4. Avoid light/regular foot traffic for at least 12 hours. Avoid heavy foot traffic for at 
least 24 hours. 
Use clean white terry cloth towels with mineral spirits to clean as you go. It is easy 
and convenient to use. Adhesive that has cured on the surface of the flooring can be 
difficult to remove. 
Getting Started Direct Glue: 
There are two ways to install when using a moisture cured urethane wood flooring 
adhesive (wet lay meaning to lay directly into wet adhesive and dry-lay method 
meaning to allow the adhesive to flash or to tack up.) 
Caution:  Whether you choose to install using the dry or wet method, follow all 
guidelines set by the adhesive manufacturer as well as the flooring manufacturer. By 
not adhering to the guidelines you can void your flooring warranties. 
 General Information for Glue-Down Installations 
1.  Use cement-based patch,  skim coat leveling products to correct substrate 
imperfections. 
2.  Regulate temperature and humidity 72 hours before, during and after installation. 
3.  At least 48 hours before installation, place cartons of wood flooring in the 
installation area. 
4.  Install and secure starter row. 
5.  Spread adhesive using recommended trowel, ensuring 95 to 100% adhesive 
contact. Wet Lay method: press flooring firmly into adhesive immediately after 
troweling. After the flooring is place, roll the entire installation with a 75 lb. 
smooth roller. 
6.  Inspect the installation and remove any adhesive smudges or drops immediately 
using mineral spirits. NOTE: Urethane adhesive is very difficult to remove once 
dry and cured. Make every effort to prevent adhesive from getting on the flooring 
surface. For best results, keep a urethane adhesive cleaner or mineral spirits 
nearby to remove any adhesive smudges or drops during installation. 
7.  Clean tools while adhesive is fresh using a urethane adhesive cleaner or mineral 
spirits. 
8.  Avoid light/regular traffic for at least 12 hours. Avoid heavy traffic for at least 24 
hours. 
9.  See adhesive manufacture guidelines for OPEN TIME on the adhesive 
container. 
10. Proper ventilation within the room must be provided. An electric fan is helpful. 
Step 1 (Wet Lay Method) 
Select a starter wall. It is recommended to start the installation along an exterior wall. 
It’s more likely to be straight and square with the room. Measure out from the wall the 
width of two planks plus 3/8” expansion and mark each end of the room and snap your 
chalk line. 
Step 2 
Spread adhesive from the chalk line to the starter wall using the recommended trowel 
size. It is important to use the correct trowel at a 45° to get the proper spread of 
adhesive applied to the sub-floor, which will produce a proper and permanent bond. 
Improper bonding can cause loose or hollow spots. 
Note: Change the trowel every 2000 to 3000 square feet (or sooner as needed) due to 
wear down of the dimples. This assures you always get the proper spread of adhesive. 
Step 3 
Install the first row of starter planks with the tongue facing the starter wall and secure 
into position. Alignment is critical and can be achieved by securing a straight edge 
along the chalk line (2x4’s work well), or by top nailing the first row with finishing nails 
(wood sub-floor), or adjustable spacers (concrete sub-floor). This prevents slippage of 
the planks that can cause misalignment. 
Note:  The planks along the wall may have to be scribed and cut to fit in order to 
maintain a consistent expansion space since most walls are not straight .Try to 
maintain at least 2” on the scribed plank. 
Step 4 
Once the starter rows are 
secure spread 2 ½ to 3 feet of 
adhesive the length of the 
room. (Never lay more 
adhesive than can be covered 
in approximately 1 hr.) Place 
tongue into groove of plank or 
strips and press firmly into 
adhesive.  Never slide planks 
or strips through adhesive.  
Use Uniclic Tapping Block if necessary to fit planks snug together at side and butt 
ends. Clean any adhesive off the surface before it cures using clean terry cloth towels 
and mineral spirits. 
Note: Never work on top of the flooring when installing. If you must work on top of the 
newly laid flooring use a kneeling board. 
Secure your starter rows with a straight edge (2x4’s). Once the remainder of the floor 
has been installed, go back to the beginning and remove the straight edges and 
spread adhesive on the remainder of the open sub-floor. Remember planks closest to 
the wall may have to be scribed and cut to fit due to irregularities along the wall. When 
using Mohawk’s Pro-Tack M908/WUA2 adhesive it is not necessary to roll the 
floor. 
Clean Up 
Use clean white terry cloth towels to clean as you go along with mineral spirits. 
It is easy and convenient to use. Adhesive that has cured on the surface of the flooring 
can be difficult to remove. 
Light foot traffic is allowed after 12 hours but wait 24 hours after installation to remove 
the Low Adhesion Delicate Surface Painters Tape. Once the tape is removed clean 
any adhesive residue left from the tape using mineral spirits on a clean white terry 
towel. 
Final Touches 
Trim excess underlayment (floating installation only) and install or re-install any 
transition pieces, reducer strips, T-moldings, thresholds, bases and/or quarter round 
moldings. Trims and moldings should be nailed into the wall, or subfloor, not the floor.  
Install the proper trim molding at the doorways to achieve the transition and along the 
walls to cover the edges of any gaps along the wall due to irregularity. 
Complete the job by using the wood filler that coordinates with the installed engineered 
flooring for minor corrections or areas where brad nails were used in the trim or the 
flooring. Clean the finished floor with Performance Accessories Cleaner. 
To prevent surface damage, avoid rolling heavy furniture and appliances on the floor. 
Use plywood or appliance lifts if necessary. Use protective castors/castor cups or felt 
pads on the legs of furniture to prevent damage to the flooring. 
Clean Up 
Use clean white terry cloth towels to clean as you go along with mineral spirits. It is easy 
and convenient to use. Adhesive that has cured on the surface of the flooring can be 
difficult to remove. Measures should be taken to protect floors from other trade work. 
If the floor is to be covered, the floor should be thoroughly cleaned prior to 
covering to prevent grit damage to the finish. Do not cover with plastic, red 
rosin, felt or wax paper or previously used cardboard. Instead use a breathable 
material such as clean, dry, plain uncoated cardboard or Kraft paper. Inks from 
printed cardboard could damage the hardwood floor. 
A common reinforced builder’s paper is a good choice. Any covering should be taped, 
using a low-adhesion tape, to base or shoe moldings. Avoid taping to finished flooring. 
When taping paper or sheets together, tape them to each other, not to the floor. The 
floor must be completely covered to eliminate uneven ambering from exposure to UV 
light. 
Page 4 
Generic Multi-Layered T&G Installation Instructions 071315 






