Installation Sheet
© 2017 Mohawk Group | mohawkgroup.com
Page 2 / 7
Clic ERT | UNICLIC® INSTALLATION
General Guidelines
‘Clic’ Enhanced Resilient Tile (ERT) is constructed with the patented Uniclic® tongue and groove design that locks the planks
together to form a tight and durable joint that limits moisture from passing through the seams. ‘Clic’ ERT is installed as a oating
oor and adhering product to the substrate is not recommended. Not recommended for wet areas or bathrooms.
WARRANTY NOTE: Exclusions apply with respect to rolling loads. If you have frequent or heavy rolling conditions, ‘Clic’ products
can be glued down to help reduce the risk of joint separation from rolling load trafc; however, our warranty excludes any
problems associated with rolling loads.
Owner/Installer Responsibility
Examine ooring for color and quality prior to installation. If material is unacceptable, contact the seller immediately. Undesirable
pieces should not be installed as ooring warranties do NOT cover materials with visible defects once they are installed. Owner
and Installer are responsible for nal inspection of ooring quality and grade. Purchase an additional 5% of ooring to allow for
cuts and an additional 10% to 15% if installing diagonally.
WARRANTY NOTE: Installer should provide owner with one carton end label from product installed and recorded moisture test
results for warranty purposes. Owner should also retain carton label, moisture test results and invoice for their records. Excess
ooring should be stored at in a climate controlled area for repairs in the event of future damage.
Job Site Conditions
• It is the responsibility of the Owner and Installer to ensure job site environmental, substrate and subsurface conditions
meet all requirements as outlined in installation instructions prior to substrate testing and ooring installation. Manufacturer
declines all responsibility for product performance or installation failure due to structural, substrate or environmental
deciencies or jobsite conditions.
• Resilient ooring installation should be scheduled after all other trades have completed their work.
• All areas where product will be installed must have a fully operational HVAC systems for at least 10 days prior to substrate
moisture testing or ooring installation and remain in operation during and after installation with constant temperatures
maintained thereafter. Conditions at testing should be at the same temperature and humidity level expected during
occupancy. The temperature should never fall below 55°F for the life of the installation. Portable heaters will not provide
consistent or adequate heat. Never use kerosene heaters.
• Proper acclimation of the room, substrate, ooring material, adhesive and all installation accessories are critical to the
success of long term ooring performance. Installation over cold substrates will interfere with product dimensions by
affecting the size of the oor and increase the potential for indentation, joint fracture or separation. The substrate temperature
must be between 65°F and 85ºF at the time of installation, and the humidity below 65% for 48 hours prior to, during, and
after pre-installation testing and installation. All substrate preparation and testing procedures must conform to appropriate
ASTM F 710, ASTM F 1869 and ASTM F 2170.