Installation Sheet

© 2017 Mohawk Group | mohawkgroup.com
Page 6 / 7
Clic ERT | UNICLIC® INSTALLATION
Additional Instructions/Notes
IMPORTANT: Maintain a ¼” expansion space around all walls, cabinets, pipes, toilet anges and any immoveable object in the
oor. Baseboard molding will cover this expansion space.
For plank installation, we recommend staggering the end joints a minimum of 6 inches.
For tile installation, we recommend staggering the end joints a minimum of 3 inches.
Never allow nails or screws, including door stops, to enter into the ERT ooring or the expansion zone around the ooring
perimeter, as it will prevent proper expansion and contraction of the structure and ooring.
Do not install four corners together, as this will not provide a stable installation.
Plank Replacement
In cases of severe damage, tiles may be replaced by cutting the bad piece out using a utility knife. To insert a replacement tile, cut
the tongue off the new piece and use a seam sealer on only the sides of the tile, adhering the new tile into place.
Plank Replacement
1. Score top of damaged plank/tile with a utility knife. Make two triangle cuts near the end joint and then connect the
points with one long cut in the middle of the plank/tile. (See diagram below)
2. Use an awl or screwdriver to tap down through plank/tile on scored triangle cut points.
3. Lift and remove damaged tile.
4. With the pattern side facing up on the new replacement plank/tile, trim off the short lip on the tongue side and the
groove on the compression joint side, making it ush with the edge of the plank/tile. Be careful not to damage the nish
surface of the tile.
Score Tile As Shown