Installation Sheet
© 2017 Mohawk Group | mohawkgroup.com
Page 6 / 7
Clic ERT | UNICLIC® INSTALLATION
Additional Instructions/Notes
IMPORTANT: Maintain a ¼” expansion space around all walls, cabinets, pipes, toilet anges and any immoveable object in the
oor. Baseboard molding will cover this expansion space.
• For plank installation, we recommend staggering the end joints a minimum of 6 inches.
• For tile installation, we recommend staggering the end joints a minimum of 3 inches.
• Never allow nails or screws, including door stops, to enter into the ERT ooring or the expansion zone around the ooring
perimeter, as it will prevent proper expansion and contraction of the structure and ooring.
• Do not install four corners together, as this will not provide a stable installation.
Plank Replacement
In cases of severe damage, tiles may be replaced by cutting the bad piece out using a utility knife. To insert a replacement tile, cut
the tongue off the new piece and use a seam sealer on only the sides of the tile, adhering the new tile into place.
Plank Replacement
1. Score top of damaged plank/tile with a utility knife. Make two triangle cuts near the end joint and then connect the
points with one long cut in the middle of the plank/tile. (See diagram below)
2. Use an awl or screwdriver to tap down through plank/tile on scored triangle cut points.
3. Lift and remove damaged tile.
4. With the pattern side facing up on the new replacement plank/tile, trim off the short lip on the tongue side and the
groove on the compression joint side, making it ush with the edge of the plank/tile. Be careful not to damage the nish
surface of the tile.
Score Tile As Shown