SolidTech Flooring—Floating Installation Instructions
Quick·Step
®
Luxury Vinyl Flooring can easily be cut using a utility
knife with the decor side face up. When cutting the vinyl plank, mark
the cut line and use the knife to make a firm cut in the surface. Then
break off the plank using both hands.
Turn the long side of the first panel of the second row into the already
secured panel in the first row at an angle of 20-30°. Move the panel to
be fitted slightly up and down and at the same time, exert some for-
ward pressure. The panels will click together.
Then slide the third plank together horizontally. Slightly lift the plank to
be installed by holding your hand underneath. Push the short side
joint down gently with your thumb moving from the inner corner
towards the outside until you hear a “click”. Ensure the short side
ends are closed by knocking gently on the short side click connection
with the palm of your hand. Don’t use a hammer or tapping block as it
could possibly damage the joint.
Next, connect the panels of the first two rows on the short sides.
Check the expansion gap to ensure it is at least 1/4” (5 mm) and
make sure the first two installed rows are perfectly straight. A chalk
line can help ensure the installed planks are aligned; adjust the
straightness of your floor as necessary.
When the uncovered portion of the underlayment is shorter than the
width of the plank, install the next row of underlayment. Connect the
two pieces of underlayment using postal grade packing tape or the
tape recommended by the underlayment manufacturer.
Continue the installation row by row towards the opposite side of the
room. Always check each joint to ensure a good locking connection
before continuing to the next plank. Press down gently with your
thumb on top of every short end joint to ensure a good locking
connection.
An expansion gap of 1/4” (5 mm) around the perimeter of the
room should be maintained; this same expansion gap should be
maintained when using transition moldings. Otherwise, there is
no need for additional expansion gaps within or between rooms.
2. INSTALLATION
11
10
9
8
12
7
Luxury Vinyl Flooring—Floating Installation Instructions 10/16
For technical assistance, please contact your ooring dealer or Quick·Step® Technical Services by calling 888-387-9882, opon 1.
4
Cut using a circular saw or reciprocating jigsaw.
Turn the long side of the rst panel of the second row into the already
secured panel in the rst row at an angle of 20-30°. Move the panel
to be tted slightly up and down and at the same time, exert some
forward pressure. The panels will click together.
Then slide the third plank together horizontally. Slightly lift the plank
to be installed by holding your hand underneath. Push the short
side joint down gently with your thumb moving from the inner corner
towards the outside until you hear a “click”. Ensure the short side
ends are closed by knocking gently on the short side click connection
with the palm of your hand or tapping block
Next, connect the panels of the rst two rows on the short sides.
Check the expansion space to ensure it is at least 1/4" (6mm) and
make sure the rst two installed rows are perfectly straight. A chalk
line can help ensure the installed planks are aligned; adjust the
straightness of your oor as necessary.
Continue the installation row by row towards the opposite side of the
room. Always check each joint to ensure a good locking connection
before continuing to the next plank. Press down gently with your
thumb on top of every short end joint to ensure a good locking
connection.
An expansion space of 1/4" (6mm) around the perimeter of the
room should be maintained; this same expansion space should be
maintained when using transition moldings. Otherwise, there is
no need for additional expansion space within or between rooms.
10
11
9
8
7
2. INSTALLATION
Quick·Step
®
Luxury Vinyl Flooring can easily be cut using a utility
knife with the decor side face up. When cutting the vinyl plank, mark
the cut line and use the knife to make a firm cut in the surface. Then
break off the plank using both hands.
Turn the long side of the first panel of the second row into the already
secured panel in the first row at an angle of 20-30°. Move the panel to
be fitted slightly up and down and at the same time, exert some for-
ward pressure. The panels will click together.
Then slide the third plank together horizontally. Slightly lift the plank to
be installed by holding your hand underneath. Push the short side
joint down gently with your thumb moving from the inner corner
towards the outside until you hear a “click”. Ensure the short side
ends are closed by knocking gently on the short side click connection
with the palm of your hand. Don’t use a hammer or tapping block as it
could possibly damage the joint.
Next, connect the panels of the first two rows on the short sides.
Check the expansion gap to ensure it is at least 1/4” (5 mm) and
make sure the first two installed rows are perfectly straight. A chalk
line can help ensure the installed planks are aligned; adjust the
straightness of your floor as necessary.
When the uncovered portion of the underlayment is shorter than the
width of the plank, install the next row of underlayment. Connect the
two pieces of underlayment using postal grade packing tape or the
tape recommended by the underlayment manufacturer.
Continue the installation row by row towards the opposite side of the
room. Always check each joint to ensure a good locking connection
before continuing to the next plank. Press down gently with your
thumb on top of every short end joint to ensure a good locking
connection.
An expansion gap of 1/4” (5 mm) around the perimeter of the
room should be maintained; this same expansion gap should be
maintained when using transition moldings. Otherwise, there is
no need for additional expansion gaps within or between rooms.
2. INSTALLATION
11
10
9
8
12
7
Luxury Vinyl Flooring—Floating Installation Instructions 10/16
For technical assistance, please contact your ooring dealer or Quick·Step® Technical Services by calling 888-387-9882, opon 1.
4
Quick·Step
®
Luxury Vinyl Flooring can easily be cut using a utility
knife with the decor side face up. When cutting the vinyl plank, mark
the cut line and use the knife to make a firm cut in the surface. Then
break off the plank using both hands.
Turn the long side of the first panel of the second row into the already
secured panel in the first row at an angle of 20-30°. Move the panel to
be fitted slightly up and down and at the same time, exert some for-
ward pressure. The panels will click together.
Then slide the third plank together horizontally. Slightly lift the plank to
be installed by holding your hand underneath. Push the short side
joint down gently with your thumb moving from the inner corner
towards the outside until you hear a “click”. Ensure the short side
ends are closed by knocking gently on the short side click connection
with the palm of your hand. Don’t use a hammer or tapping block as it
could possibly damage the joint.
Next, connect the panels of the first two rows on the short sides.
Check the expansion gap to ensure it is at least 1/4” (5 mm) and
make sure the first two installed rows are perfectly straight. A chalk
line can help ensure the installed planks are aligned; adjust the
straightness of your floor as necessary.
When the uncovered portion of the underlayment is shorter than the
width of the plank, install the next row of underlayment. Connect the
two pieces of underlayment using postal grade packing tape or the
tape recommended by the underlayment manufacturer.
Continue the installation row by row towards the opposite side of the
room. Always check each joint to ensure a good locking connection
before continuing to the next plank. Press down gently with your
thumb on top of every short end joint to ensure a good locking
connection.
An expansion gap of 1/4” (5 mm) around the perimeter of the
room should be maintained; this same expansion gap should be
maintained when using transition moldings. Otherwise, there is
no need for additional expansion gaps within or between rooms.
2. INSTALLATION
11
10
9
8
12
7
Luxury Vinyl Flooring—Floating Installation Instructions 10/16
For technical assistance, please contact your ooring dealer or Quick·Step® Technical Services by calling 888-387-9882, opon 1.
4
Quick·Step
®
Luxury Vinyl Flooring can easily be cut using a utility
knife with the decor side face up. When cutting the vinyl plank, mark
the cut line and use the knife to make a firm cut in the surface. Then
break off the plank using both hands.
Turn the long side of the first panel of the second row into the already
secured panel in the first row at an angle of 20-30°. Move the panel to
be fitted slightly up and down and at the same time, exert some for-
ward pressure. The panels will click together.
Then slide the third plank together horizontally. Slightly lift the plank to
be installed by holding your hand underneath. Push the short side
joint down gently with your thumb moving from the inner corner
towards the outside until you hear a “click”. Ensure the short side
ends are closed by knocking gently on the short side click connection
with the palm of your hand. Don’t use a hammer or tapping block as it
could possibly damage the joint.
Next, connect the panels of the first two rows on the short sides.
Check the expansion gap to ensure it is at least 1/4” (5 mm) and
make sure the first two installed rows are perfectly straight. A chalk
line can help ensure the installed planks are aligned; adjust the
straightness of your floor as necessary.
When the uncovered portion of the underlayment is shorter than the
width of the plank, install the next row of underlayment. Connect the
two pieces of underlayment using postal grade packing tape or the
tape recommended by the underlayment manufacturer.
Continue the installation row by row towards the opposite side of the
room. Always check each joint to ensure a good locking connection
before continuing to the next plank. Press down gently with your
thumb on top of every short end joint to ensure a good locking
connection.
An expansion gap of 1/4” (5 mm) around the perimeter of the
room should be maintained; this same expansion gap should be
maintained when using transition moldings. Otherwise, there is
no need for additional expansion gaps within or between rooms.
2. INSTALLATION
11
10
9
8
12
7
Luxury Vinyl Flooring—Floating Installation Instructions 10/16