Installation

© 2017 Mohawk Group | mohawkgroup.com
Page 8 / 8
Glue Down Commercial Resilient Tile | INSTALLATION
Restrict heavy trafc, rolling loads, or furniture placement for 72 hours after installation with M95.0 or M700; restrict
this type of trafc for 24 hours with MS160. Additional time may be necessary if the installation is over a non-porous
substrate.
Return appliances and furniture to the room by rolling or sliding them over strips of hardboard.
Allow at least ve days following the installation before conducting wet cleaning procedures or initial maintenance.
Mohawk continuously makes technological advancements that improve product performance or installation techniques and
methods. All instructions and recommendations are based on the most recent information available and should be followed for an
ideal installation. Contact Mohawk Group Technical Services at 800-833-6954 with questions about product installation or visit our
website at mohawkgroup.com to ensure you have the most up to date version of our installation instructions.