Installation Guide

1
Residential Installation Guide —
Luxury Vinyl Tile Click
Mohawk Residential Installation Guide — LVT Click
Materials Required for Installation:
Tape Measure
Utility Knife
Small Hand Roller (Seam Roller)
Square Ruler
Chalk Line
Scrap piece of LVT/P material
tapping to tighten joints
Acceptable Underlayments
Mohawk’s LVT Click Products can be installed directly over most existing oor coverings, except for carpet, laminate, oating
oors systems and cushioned vinyl ooring.
Wood Underlayment
Cangoovervirtuallyanysoundwoodunderlayments/suboors.Alwaysfastenunderlaymentinaccordancewiththe
manufacturer’srecommendations.For“specialneeds”gluedownapplications(steps,ramps,landings,etc.),Mohawk
recommendsunderlaymentsthatareunderlaymentgradeandwarrantedbythemanufacturer.Anyfailureofthe
underlaymentorooringasaresultoftheunderlaymentisNOTtheresponsibilityofMohawk.
Concrete
Moisturelevelsofconcreteslabsbefore,duringandafterinstallationmustbe8lbs.orlessper100squarefeetper
24hoursusingananhydrouscalciumchloridetestaccordingtoASTMF1869andpHmustbebetween5.0and9.0;
or,ifusingASTMF2170IN-SituProbes,shouldbelessthan90%RH(relativehumidity).Insomeinstances,itmaybe
necessarytoadheretheLVTto“Specialneeds”areas(steps,ramps,landings,etc.)
Radiant Heated Floors
Radiantheatedoorsmustbeapprovedbythemanufacturerfortheuseoftheirproductwithresilientvinylooring
applications.Thesuboortemperatureshouldnotexceed85°F(29°C)andthesystemshouldbeturnedoff24hoursprior
toandaftertheinstallation.Note:MohawkdoesnotrecommendtheuseofKalmunderlaymentwithradiantheatedoors.
Storage and Handling
Acclimate the ooring a minimum of 24 hours before installation in the area it is to be installed. Conditions between 65° F and
85° F (18° C and 29° C) are required before, during and after installation. Cartons should be evenly stacked no more than ve
high on a at surface and away from any heating/cooling ducts or direct sunlight.
Suboor and Wall/Door Preparation
Note:DonotinstallcabinetsontopofoatingLVT. The surface beneath the oor must be sufciently prepared in advance to
guarantee a successful installation of the ooring.
Fill any low spots in the suboor greater than 3/16 inch in 10 foot span with a Portland cement leveling compound.
Ceramic tile and embossed ooring will require skim coating with a Portland based patch to avoid bottom up
pattern telegraphing.
Remove any existing oor molding. Removal of wall baseboards is optional as a quarter round can be installed to
avoid baseboard removal.
Undercut doorjamb so the ¼ inch expansion space is maintained, allowing the LVT to slip under doorjamb/case molding.
Sweep the suboor clean. The oor must also be free of all contaminants.
PLEASE NOTEwarrantyexclusionswithrespecttorollingloads.Ifyouhavefrequentorheavyrollingconditions,click
productscanbeglueddowntohelpreducetheriskofjointseparationfromrollingloadtrafc;howeverourwarrantystill
excludesanyproblemsassociatedwithrollingloads.