Installation Guide

1
Luxury Vinyl Flooring
Unidrop Click Lock Tile Installation
072020
PRODUCT DESCRIPTION
GRADE LEVELS
INSTALLATION METHOD
Flexible Luxury Vinyl Flooring
Above, On and Below
Unidrop Click Lock
Luxury Vinyl Flooring Unidrop Click Lock Tile Installation
Tools Required for Installation
Tape Measure
Utility Knife
Eye Protection
Gloves
Square Ruler
Chalk Line
Scrap Piece of LVT
Acceptable Underlayment
Mohawk Luxury Vinyl Click products can be installed directly over most existing floor coverings, except carpet,
laminate, floating floors systems and cushioned vinyl flooring.
Wood
Can be installed over virtually any sound wood underlayments or subfloors. Always fasten underlayment in
accordance with the manufacturer’s recommendations. For glue down applications to accommodate
special needs (e.g. steps, ramps, landings, etc.), Mohawk recommends underlament grade products
warranted by the manufacturer. Any failure of the underlayment or flooring as a result of the underlayment
is NOT the responsibility of Mohawk.
Concrete
Moisture levels of concrete slabs before, during and after installation must be 8 lbs. or less per 1,000
square feet per 24 hours using an anhydrous calcium chloride test according to ASTM F1869 and pH must
be between 5.0 and 9.0; or, if using ASTM F2170 in-situ probes, readings should be less than 90% RH
(relative humidity). In some instances, to accommodate special needs, it may be necessary to adhere the
LVT to steps, ramps, landings. Refer to the Mohawk LVT Glue Down instructions if adhering is necessary.
Radiant Heat Systems
Radiant heat systems must be approved by the manufacturer for use in resilient vinyl flooring applications.
The subfloor temperature should not exceed 85°F (29°C), and the system should be turned off 24 hours
prior to and after installation.
Storage and Handling
No product acclimation is required if the product temperature is between 45°F and 115°F (7°C and 46°C). Room
temperature conditions must be controlled between 45°F and 115°F (7°C and 46°C) 48 hours before, during and 48
hours after installations. Cartons should be evenly stacked no more than five high on a flat surface and away from
any heating/cooling ducts or direct sunlight.

Summary of content (9 pages)