Installation Instructions
8 
GENERAL REQUIREMENTS 
1.0  Applicable Documents and References 
1.1  Carpet and Rug Institute References: 
  The Carpet Primer * 
  Carpet Maintenance and Troubleshooting* 
1.2  Most recent ASTM Standards: 
  ASTM F-710 – Standard Practice for Preparing Concrete to Receive Resilient 
Flooring 
  ASTM F-1869 – Test Method for Measuring Moisture Vapor Emission Rate of 
Concrete Subfloor Using Calcium Chloride 
  ASTM F-2170 – In-situ Relative Humidity Testing 
2.0  Terminology 
For terms and definitions used in this standard, refer to the Definitions of Terms 
section in the Appendix of this document. 
3.0  Tools and Materials 
Carpet installation requires using tools and materials referenced in this standard. Refer 
to the Tools and Materials tables in the Appendix of this document. 
4.0  Storage and Handling 
4.1  Storage 
Store carpet and related materials in a climate-controlled, dry space. Protect 
carpet from soil, dust, moisture and other contaminants and store on a flat surface. 
Stacking heavy objects on top of carpet rolls is prohibited. Double stacking pallets 
of carpet tile should be avoided unless approved by the manufacturer. 
4.2  Handling 
Transport carpet in a manner that prevents damage and distortion. Bending or 
folding individual carpet rolls or cuts from rolls are not recommended. When 
bending or folding is unavoidable for delivery purposes, the carpet is required to be 
unrolled and allowed to lie flat immediately upon arrival at the installation site. 
NOTE: Failure to observe the preceding requirements may result in the 
following: 
  Contamination from soil, grease and/or oil 
  Delamination 
  Dimensional changes 
  Permanent indentation   










