Installation Instructions

8
GENERAL REQUIREMENTS
1.0 Applicable Documents and References
1.1 Carpet and Rug Institute References:
The Carpet Primer *
Carpet Maintenance and Troubleshooting*
1.2 Most recent ASTM Standards:
ASTM F-710 Standard Practice for Preparing Concrete to Receive Resilient
Flooring
ASTM F-1869 Test Method for Measuring Moisture Vapor Emission Rate of
Concrete Subfloor Using Calcium Chloride
ASTM F-2170 In-situ Relative Humidity Testing
2.0 Terminology
For terms and definitions used in this standard, refer to the Definitions of Terms
section in the Appendix of this document.
3.0 Tools and Materials
Carpet installation requires using tools and materials referenced in this standard. Refer
to the Tools and Materials tables in the Appendix of this document.
4.0 Storage and Handling
4.1 Storage
Store carpet and related materials in a climate-controlled, dry space. Protect
carpet from soil, dust, moisture and other contaminants and store on a flat surface.
Stacking heavy objects on top of carpet rolls is prohibited. Double stacking pallets
of carpet tile should be avoided unless approved by the manufacturer.
4.2 Handling
Transport carpet in a manner that prevents damage and distortion. Bending or
folding individual carpet rolls or cuts from rolls are not recommended. When
bending or folding is unavoidable for delivery purposes, the carpet is required to be
unrolled and allowed to lie flat immediately upon arrival at the installation site.
NOTE: Failure to observe the preceding requirements may result in the
following:
Contamination from soil, grease and/or oil
Delamination
Dimensional changes
Permanent indentation