Installation Guide

TOOLS REQUIRED:
Drill bit 5/32” (.156”)
Drill (with adjustable clutch, recommended)
Miter Saw (with metal cutting blade)
Level
Rubber mallet
Tape measure
Touch-up paint
ALUMINUM LEVEL RAIL
INSTALLATION INSTRUCTIONS
FOR A SUCCESSFUL INSTALLATION:
Read the instructions completely before beginning the installation.
Plan your railing project. Sketch your project with the actual measurements of your deck or balcony complete
with post locations.
Check local building codes to ensure compliance.
Check carton(s) to determine part count is complete.
After cutting rails, balusters, or posts, paint exposed metal for maximum protection against the elements.
Installation is best accomplished with two people.
Wear personal protection equipment; safety glasses, etc.
Use care not to over-torque the screws. Pre-drilling is recommended.
Provided hardware to install MoistureShield
®
Pro Aluminum Rail is for use with MoistureShield
®
Pro
Aluminum Posts. If installing to other surfaces the installer must acquire the appropriate hardware as
needed for proper installation.
866.729.2378 | WWW.MOISTURESHIELD.COM

Summary of content (8 pages)