Installation Guide
TOOLS REQUIRED:
•  Drill bit 5/32” (.156”)
•  Drill (with adjustable clutch, recommended)
•  Miter Saw (with metal cutting blade)
•  Level
•  Rubber mallet
•  Tape measure
•  Touch-up paint
FOR A SUCCESSFUL INSTALLATION:
•  Read the instructions completely before beginning the installation.
•  Plan your railing project. Sketch your project with the actual measurements of your deck or balcony complete 
with post locations.
•  Check local building codes to ensure compliance.
•  Check carton(s) to determine part count is complete.
•  After cutting rails, balusters, or posts, paint exposed metal for maximum protection against the elements.
•  Installation is best accomplished with two people.
•  Wear personal protection equipment; safety glasses, etc.
•  Use care not to over-torque the screws. Pre-drilling is recommended.
•  Provided hardware to install MoistureShield
®
 Pro Aluminum Rail is for use with MoistureShield
®
 Pro 
Aluminum Posts. If installing to other surfaces the installer must acquire the appropriate hardware as 
needed for proper installation.
866.729.2378 | WWW.MOISTURESHIELD.COM
ALUMINUM FIXED STAIR RAIL
INSTALLATION INSTRUCTIONS








