Installation, Care & Maintenance Instructions 2020 / January MOIS TUR E S HIELD.
Welcome To The Even Greater Outdoors. Congratulations on choosing MoistureShield® for your outdoor living experience. Take comfort in knowing that you selected an exceptional decking material built solidly on these key standards: performance, innovation and beauty. As a result of our continued technological advances like our total encapsulation process, MoistureShield is the only wood-plastic-composite decking product that can be installed on or in the ground or even underwater.
General Cleaning & Maintenance Instructions In an outdoor environment, periodic cleaning will help keep your deck looking new. As with any flooring surface, periodic cleaning is required. Below are suggested recommendations for specific cleaning issues: If you have any questions or concerns about caring for your deck please call customer service at 866.729.2378 or contact us online.
Warranty MoistureShield Composite Decking is proudly manufactured by MoistureShield Inc., a CRH Company, which warrants all MoistureShield products against rot, decay, and insect damage with a limited 50 year warranty. Infuse and Vision have a 25 year to a 50 year fade and stain warranty, depending on the product. See below for warranties by line.
Technical Specifications 1x6 2x2 2x4 2x6 2x8 Fascia* PRODUCT ACTUAL DIMENSIONS** 1.0 x 5.4in 1.5 x 1.265in 1.5 x 3.5in 1.4 x 5.4in 1.4 x 7.25in 0.67 x 11.25in 25 mm x 137 mm 38 mm x 32 mm 38 mm x 89 mm 35 mm x 137 mm 35 mm x 184 mm 17 mm x 285 mm 12ft 12ft, 16ft 12ft, 16ft, 20ft 8ft, 12ft, 16ft, 20ft 3.66 m 3.66 m, 4.88 m 3.66 m, 4.88 m, 6.1 m 2.44 m, 3.66 m, 4.88 m, 6.1 m 12ft, 16ft, 20ft LENGTHS AVAILABLE 3.66 m, 4.88 m, 6.1 m 12ft 3.
Storage & Handling Decking products are made to withstand the rigors of the outdoors. But no matter the material, it’s still important to properly handle decking to prevent injury and blemishes on the boards. Follow these storage and handling strategies to ensure decking planks look their best when it comes time to install. Storage 1. KEEP IT COVERED All decking materials will fade over time with exposure to the sun.
Pre-installation Tools Fasteners All you’ll need is a hammer and screw gun, circular saw (carbidetipped blade with fewer than 20 teeth is recommended), 10" or 12" miter saw can also be used (carbide-tipped blade with 40 teeth is recommended), eye protection, ear protection (optional), level, tape measure, rasp (Vantage only) and blue chalk line. Use blue chalk. Other colored chalk may stain your deck. Each composite post requires two, 1/2" (12.7 mm), carriage bolts 8-inches minimum length with 11/4" (31.
Deck Clip Installation Guide Benefits: • Easiest clip to install with square drive ACQ compatible screws or pneumatic fasteners • Concealed deck clips allow for an unblemished deck surface • Base of clip elevates board off the joists, reducing rot, mold, ice shear and lateral load stress • Automatically spaces the deck boards 3/16” for a uniform appearance. (Deck clips will automatically space boards 3/16 in apart. The ideal spacing when fastening with screws is 1/4 in.
Standard Installation DO NOT USE YOUR DECK AS A WORK BENCH. It’s important to keep your deck free of excess dirt, dust, debris, pavers, and other building materials during construction. If you do use your deck as a storage place for building materials, you risk permanently damaging it. 1 Layout and install joists at either 16” (40 cm) on-center (OC) when decking will be installed perpendicular to the joists, or 12” (30 cm) (OC) when deck boards will be installed diagonally or at an angle to the joists.
3 Pattern Board, as referenced in 3C Install MoistureShield® decking using 21/4 in (57.15 mm), #7 stainless steel trim head screws, two screws per board per joist. Screws should be a minimum of 1/2 in (12.7 mm) from the board end and edges. (when using screws, leave 1/4 in space between boards.) For additional face screw options see page 11 & 12. A. Allow ¼" (6 mm) side-to-side spacing between deck boards.
Batten/Sleeper Installation A batten/sleeper system is a substructure between a solid surface and MoistureShield decking surface. Drainage, access, and airflow are essential for the longevity of the installation. Water must be able to freely flow between the boards and away from the deck substructure. For repairs and removal of debris, joist access may be necessary.
Face Screw Stair Installation Prior to construction, check with your local regulatory agency for special code requirements in your area. For best results, follow the installation instructions given below. 11" (28 cm) Minimum Tread Depth 3/4" (19 mm) Max Overhang 1/4" (6 mm) Gapping Fascia Board Cut to Fit 9" (23 cm) Stringer Spacing WARNING: Fascia is never to be used as a walking surface. Elevate requires an 8in (20cm) stringer spacing. Stringer spacing is a maximum of 9" (23 cm) on center.
Face Screw Fasteners Sizes Cap-Tor ® xd Epoxy Coated Carbon Steel T-20 star drive: 10 x 2" • 10 x 2¾" Cap-Tor ® xd Headcote® Stainless (Grade 305 and Marine Grade 316) T-20 star drive: 10 x 2" • 10 x 2½” • 10 x 2¾" Packs 100 pc. Accessory Pack 350 pc. (100 sq ft) Deck Pack 1050 pc. (300 sq ft) Contractor Pack 1750 pc. (500 sq ft) Pro Pack 1500 pc. Collated for Muro ® Ultra Driver Approved for use with ACQ treated lumber.
8 6 6 .7 2 9 . 2 3 7 8 | w w w. m o i s t u r e s h i e l d .
MoistureShield® Approved Fascia Fastening Solution 1 2 Pre-drill using the Fascia Plug Tool 3 Set screw using the PVC/Composite Tool Fascia Plug Tool Tap in plug with smooth faced hammer Patented Starborn Industries, Inc. 45 Mayfield Ave, Edison, NJ 08837 · P. 800-596-7747 · W. www.starbornindustries.com MoistureShield is a registered trademark of Oldcastle APG - A CRH Company.
COMPOSITE RAILING INSTALLATION Tools All you’ll need is a hammer and screw gun, circular saw (carbide-tipped blade with fewer than 20 teeth is recommended), level, tape measure, rasp and blue chalk line. Use blue chalk. Other colors may stain your deck. Carbide-tipped blade with fewer than 20 teeth. Magnum Railing ACTUAL DIMENSIONS*: 2.92" × 3.95" LENGTH: 6 feet FITS 4” x 4” Post Carbide-tipped blade with fewer than 20 teeth. 4" × 4" Post Carbide-tipped blade with fewer than 20 teeth.
COMPOSITE RAILING INSTALLATION Railing Orientation - Magnum Railing: The magnum rail can be installed with either the long leg (4 inch) or the short leg (3 inch) in the horizontal orientation. It is recommended that top stair rails be installed with the short leg in the horizontal orientation for a better grip. The balusters sit on the ledge of the bottom leg of the bottom magnum rail and are covered by the top magnum rail leg.
3. Cut two temporary blocks from scrap material to the height you want the toe sweep (no less than 2-inches nor greater than 4-inches). Place on inside of posts sitting on decking. 4" 3" A. Set bottom magnum rail on blocks (with the 4-inch leg resting on the blocks) and center on post. B. Place baluster against post and sit it on the bottom magnum rail (1-1/4-inch side against the post). Baluster 1-1/4" Temporary Blocks *INSTALLATION TIP: · Use clamps to secure for easier installation. C.
4. 5. Place top magnum rail on balusters (see railing orientation for details) and repeat fastening as in step 3. In addition, angle (toe nail) two 2-1/4-inch , #7 stainless steel trim head screws from top magnum rail directly into each post. Countersink the screws no more than ¼ inch. To avoid potential splitting, drill a lead hold with a 7/64 drill bit at a 45-degree angle, one-inch away from the end of the magnum rail.
7. 8. Use the formula below to determine the amount of balusters you need and the spacing between them. Measure the distance in inches between the inside of one post baluster to the inside of the other post baluster. This is your total space. A. Divide the total space by 5, and round it off to a whole number. This is the number of additional balusters you need. B. Multiply the value in (A) by 1.5 and subtract it from your total space.
45-DEGREE RAILING INSTALLATION 1. Attach posts to decking frame. Square to straight side of rim joist and level. After installing all posts, install the deck planks. After all deck planks are down complete the railing install. Start railing install by slipping post collar over the post. Slip post collar over post onto deck if installing collars. Follow procedures 2-4 to install posts and decking. 2. Determine the angle of the top magnum rail. A.
STAIR RAILING INSTALLATION 1. Attach posts to stair stringers (stringers should be placed 12-inch OC or less). Square posts to stringers and level. Be sure posts measure no more than 72-inches from outside to outside at the angle of the stairway when using as a stair rail. Guard rail sections are sold in 72inch lengths and must be trimmed to fit between the posts. Allow for decrease in length from angle cuts. A.
3. Lay a top and bottom magnum rail along the edges of the steps and up next to the post. A. Position both rails for marking with the 2-5/8-inch leg lying on the steps. 72 " B. Mark the rails on the inside faces of the two upright posts. C. Cut each rail along this mark (line). 4. Position bottom magnum rail 1/2inch above edges of steps (check local code) support on blocks cut from scrap material. 5.
ALUMINUM LEVEL RAIL INSTALLATION INSTRUCTIONS TOOLS REQUIRED: • Drill bit 5/32” (.156”) • Drill (with adjustable clutch, recommended) • Miter Saw (with metal cutting blade) • Level • Rubber mallet • Tape measure • Touch-up paint FOR A SUCCESSFUL INSTALLATION: • Read the instructions completely before beginning the installation. • Plan your railing project. Sketch your project with the actual measurements of your deck or balcony complete with post locations.
ALUMINUM LEVEL RAIL INSTALLATION INSTRUCTIONS PARTS INCLUDED: A TOP RAIL WITH CONNECTORS (1) B BOTTOM RAIL WITH CONNECTORS (1) G SUPPORT BLOCK CONNECTOR (2) C SADDLE BRACKET (2) H #10X1” SELF DRILLING SCREW (12) D BOTTOM BRACKET (2) E TOP RAIL CAP (2) J ADHESIVE TAB (1) 3 ½” SQUARE DRIVER BIT (1) F 10” SUPPORT BLOCK (1) I NOTE: Post and balusters packaged separately. LEVEL RAIL POSTS INSTALLATION: 1. Measure and locate the position of the post(s) based on the project layout.
RAIL INSTALLATION: 1. Carefully measure the opening between posts or walls and calculate the length of rail that needs to be cut. Divide the trim length amount in half, and starting with the bottom rail (B), transfer and mark the measurement to each end of the rail. For the sake of baluster spacing or personal preference, all of the trim length could be cut from one end of both rails. Make this determination before cutting the rails.
9. Slide the top rail cap (E) on both ends of the top rail (A) and set the rail assembly into the saddle brackets (C) letting the bottom rail hang freely between the posts. Check for level. Note: It is recommended to use the box as a pad to prevent scuffing of the painted finish. If installing square balusters, make sure they are properly seated in the slot on the underside of the top rail to prevent twisting. 10.
ALUMINUM FIXED STAIR RAIL INSTALLATION INSTRUCTIONS TOOLS REQUIRED: • Drill bit 5/32” (.156”) • Drill (with adjustable clutch, recommended) • Miter Saw (with metal cutting blade) • Level • Rubber mallet • Tape measure • Touch-up paint FOR A SUCCESSFUL INSTALLATION: • Read the instructions completely before beginning the installation. • Plan your railing project. Sketch your project with the actual measurements of your deck or balcony complete with post locations.
ALUMINUM FIXED STAIR RAIL INSTALLATION INSTRUCTIONS PARTS INCLUDED: A TOP RAIL WITH CONNECTORS (1) B BOTTOM RAIL WITH CONNECTORS (1) C UPPER SADDLE BRACKET (1) D LOWER SADDLE BRACKET (1) E TOP RAIL CAP (2) F UPPER BOTTOM BRACKET (1) G LOWER BOTTOM BRACKET (1) H 10” SUPPORT BLOCK (1) I SUPPORT BLOCK CONNECTOR (2) J #10-1”SELF DRILLING SCREWS (12) K 3 ½” SQUARE DRIVER BIT (1) L ADHESIVE TAB (1) NOTE: Post and balusters packaged separately. POSTS INSTALLATION: 1.
FIXED RAIL INSTALLATION: 1. Lay the bottom rail (B), with baluster connectors facing up and centered between the posts, on the stair nosing from top to bottom, adjacent to the posts and mark a line on the rail from the inside of each post (1). Also, make a reference mark on the bracket side of both posts at the point where the top of the rail meets the post (2). Note: This reference mark will be used to locate saddle brackets in step 5. 2.
12. Slide the top rail caps (E) over each end of the top rail (A) so the angle of the rail cap matches the angle of the top rail. A small piece of tape may be used to hold the top rail caps (E) in place. 13. Slide bottom brackets (F&G) with the counter bore holes facing down and toward the balusters, over each end of the bottom rail (B). A small piece of tape may be required to hold lower bottom brackets in place.
BULLET LIGHTS INSTALLATION INSTRUCTIONS COMPLETE KIT INCLUDES: REQUIREMENTS: • 10 LED Flush-mount Deck/Stair Lights Before you begin, make sure you have an external, weatherproof, protected 110 volt outlet that meets GFCI (ground fault circuit interrupter) standards. Mount the transformer 18 inches above the ground. Best results can be achieved when you have access to the underside of your deck or installation surface. Do not install more than 40 MoistureShield ® bullet lights on one transformer.
BULLET LIGHTS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS CAUTION: Use eye protection when using power tools. Do not install within 10 feet of a pool, fountain or spa. LED DRIVER BOX 1. Mount the transformer 18 inches above the ground near your outlet using screws. Do not plug it in. REMOTE CONTROL DRIVER 3/4” 1 1/8” 2. Determine the spacing of your lights on your deck. Be sure to avoid positioning lights over joists and headers or on spacing gaps.
BULLET LIGHTS INSTALLATION INSTRUCTIONS 4. To install a light module, untwist the wire coming up from below the hole in the center of the slack. There is no need to cut or strip the wire. Use two green connectors for each light. First insert the black twisted wire into the open side of a connector so that it fits snugly in the space provided. It will go all the way through the connector. Then take the black wire from the light and insert it into the other hole in that connector.
STRIP LIGHTS DECK CLIP SYSTEM STRIP LIGHTS INSTALLATIONINSTRUCTIONS INSTRUCTIONS INSTALLATION INSTALLATION INSTRUCTIONS REQUIREMENTS: TOOLS NEEDED: BENEFITS: Before you begin, make sure you have an external, • Power Drill • 110 Easiest to install square drive ACQ•compatible screws or pneumatic fasteners weatherproof, protected voltclip outlet thatwith meets Screwdriver GFCI (ground fault circuit interrupter) standards.
STRIP LIGHTS INSTALLATION INSTRUCTIONS STRIP LIGHTS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: NOTE: This installation method is intended for installation with metal railing. Certain steps may be different for wood or composite installation. Strip lights can also be connected to wood or composite railing using the clear brackets included. Each bracket will require two small screws (not included). This fastening method will not work on metal rails.
STRIP LIGHTS INSTALLATION INSTRUCTIONS STRIP LIGHTS INSTALLATION INSTRUCTIONS 3. Predrill the other hole on each end of the rail using a 3/8” bit. This will be used to thread the wire through the rail. To keep the wire out of sight, you can also predrill a small 3/8” hole in the post where it will be hidden by the rail and/or brackets. 4. Slide the strip light into housing with the white wire on top.
STAIRSTAIR LIGHTS LIGHTS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS DIMENSIONS: 3-1/2” Round by 1-1/4” Deep DESIGN APPLICATION 12V, Low-Voltage Warm White LED, 7W Bulb, rated for 25,000 hours TOOLS REQUIRED: • 1/2” Drill • 3/8” Drill Bit • 3” Forstener Bit • Insulated Wire Tacks • Phillips Screw Driver • 12-2 Low Voltage Wire • Flat Head Screw Driver • Silicone Filled Wire Nuts Original and attractive style enhance the beauty and charm of your home at night, as well as during the day.
STAIR LIGHTS INSTALLATION STAIR LIGHTS INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS:: CAUTION: Use eye protection when using power tools. Do not install within 10 feet of a pool, fountain or spa. TRANSFORMER INSTALLATION: 1. Start by determining and marking where each fixture is to be installed. Next, determine the sequence in which the main line will run. The fixtures should run in sequence and the total wattage of each run should not exceed the transformer’s circuit.
STAIR LIGHTS INSTALLATION STAIR LIGHTS INSTRUCTIONS INSTALLATION INSTRUCTIONS 6. Drill a 3/8” hole all the way through the deck in the center of the 3” hole. Next, run the fixture wire through the 3/8” hole to the underside of the deck where wire connections will be made. NOTE: Tabs on the outside of the 3” back box must be removed with a flat head screw driver. DO NOT drill 3/8” side holes. DECK CLIP SYSTEM INSTALLATION INSTRUCTIONS 7.
LIGHTS POSTPOST LIGHTS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS DIMENSIONS: Thin Down LED: 1-3/4” wide x 1-1/4” tall Hourglass LED: 1-3/16” wide x 3-1/8” tall DESIGN APPLICATION 12V, Low Voltage Warm-White LED, 1-1.
POST LIGHTS INSTALLATION POST LIGHTS INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: CAUTION: Use eye protection when using power tools. Do not install within 10 feet of a pool, fountain or spa. TRANSFORMER INSTALLATION: 1. Start by determining and marking where each fixture is to be installed. Next, determine the sequence in which the main line will run. The fixtures should run in sequence and the total wattage of each run should not exceed the transformer’s circuit.
POST LIGHTS INSTALLATION POST LIGHTS INSTRUCTIONS INSTALLATION INSTRUCTIONS 6. We recommend predrilling the wire hole and holes for the mounting screws to prevents cracking in the surrounding material. Use a drill bit that is smaller than the screw to ensure the screw will hold. If passing wire through and making connection under a post cap or below your decking, use a 1/4” drill bit. TIP: Run wire through post and double check mounting screw placement before predrilling these holes.
POST CAP LIGHTS POST CAP LIGHTS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS DIMENSIONS: Fits 3” Post DESIGN APPLICATION 12V, Low-Voltage Warm White LED, 1 Watt, rated for 25,000 hours TOOLS REQUIRED: • 1/2” Drill • 3/8” and 3/16” Drill Bits • Insulated Wire Tacks • Phillips Screw Driver • 12-2 Low Voltage Wire • Silicone Filled Wire Nuts Post cap lights put the finishing touch on your deck by adding ambiance, character and style to your railing design.
POST CAP LIGHTS INSTALLATION CAP LIGHTS INSTRUCTIONS POST INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS:: CAUTION: Use eye protection when using power tools. Do not install within 10 feet of a pool, fountain or spa. TRANSFORMER INSTALLATION: 1. Start by determining and marking where each fixture is to be installed. Next, determine the sequence in which the main line will run. The fixtures should run in sequence and the total wattage of each run should not exceed the transformer’s circuit.
POST CAP LIGHTS INSTALLATION CAP LIGHTS INSTRUCTIONS POST INSTALLATION INSTRUCTIONS 5. If installing multiple cap lights, it is often easier to “daisy chain” the wire by connecting them through the railing and only running one wire through the surface of the deck to the transformer. To do this, predrill a 3/8” hole in the area hidden by the rail and/or brackets and run wire from previous light into the next post where it can be connected to your next post cap light.
MOIS TUR E S HIELD.COM AERT19-758 © 2020 MoistureShield® is part of the Architectural Products Group of Oldcastle® APG, Inc.