Full Product Manual

MoJack EZ Lift
10
Operating Instructions
Preparing the MoJack EZ for Use (Steps 1 - 7)
STEP 2
Installing Lift Arm
• Hang the Lift Arm on the Carrier by hooking the slotted area
of the Lift Arm over the top bar of the Carrier.
• Insert Clevis Pin through the hole in Carrier and lock by
fastening the Small Hair Pin to the Clevis Pin.
Top Bar
Carrier
Clevis Pin hole
Clevis PinSmall Hair Pin
STEP 1
Unfolding MoJack EZ
• Pull locking pin out to unlock.
• Raise the Tower by pulling up on the Grip Handle.
Once the Tower is in the vertical position, lift up on
the Grip Handle and drop the Tower into the Base.
• The tower will be securely locked in place when the
locking pin retracts and the tower is snug in the
channel behind the crossbar.
Tower Locking
Pin
(locked position)
Tower Locking Pin
(unlocked position)
Crossbar in
channel
Crossbar
Drop Tower into Base
Tower Locking Pin
(unlocked position)
When Tower is
above the bar,
unit is NOT
locked and
UNSECURE.
When Tower sits
behind the bar,
unit is locked
and
fully secure.