Installation Guide

Adjustable wrench Philips Sorewdriver
Hexagon wrenchPipe tape
DESCRIPTION
Thermostatic Shower Column Set
Brass Construction
1.Please check that all components are present.
2.Before installation ensure that all feed lines are clear of debris and
on/off valve is present.
3.Ensure water pressure is between 20-125 PSI (includes combination
of hot and cold feed lines).
4.Pictures in the manual are general in content and may not represent
exactly your purchased faucet. If you are having difficulties please
contact a professional plumber.
5.If you will be away from home for an extended period you should
shut off the main water supply.
6.Please insure that to make a wash for all water pipe before
installation to insure no impurity inside.
7.When you need to welding the shower valve to the water pipe of the
valve , please remember to take out the cartridge and any seal parts of
the valve . When finish welding , need to wait for body of the valve
cool down and then install the cartridge and the seal parts.
8.Need to used the 11-13N.m power to lock the cartridge.
All valve have the pass the the air testing and pressure
testing before ship out. If request presssure testing
before installation,Must under the guide of the
professional Plumber with license. And air pressure do
not over 125PSI. lf you want to the Brust testing over
50±2PSI,you need to changed a new cartridge for
normal using.
Important
Technical drawing
TEL:(720)805-3223
Note: Dimensions are for reference only.
Detailed information is in accordance with the final product.
STANDARDS
Third party certified to meet ASME A112.18.1
all applicable requirements referenced therein

Summary of content (2 pages)