Specifications
Step
7:lnstall Flue Pipe
B
Wall
Thickness:
5-8
'/>
inches
1.
Slide
the
outer flange
and the
rubber packing onto
Flue
pipe
B.
(Figure
11)
Rubber
Packing
Outer
Flange
.
A
'/'A
Rubber
Packing
Outer
Flan
9
e
Fig.
11
Flue Pipe
B
2.
Spread caulking material
on the
inside
of the
rubber
packing
if
required. (Figure
12)
Rubber
Packing
Fig.
12
3. It is
imprtant
to
keep
the
"UP" mark
on the
rubber
packing
at the top
while screwing
in
Flue pipe
B.
Hold
the
packing
in
place while screwing
in
Flue
pipe
B
until
it is the
tight. (Figure
13)
Rubber
Packing
Fig.
13
Flue
Pipe
B
Wall
Thickness:
v«
-5
inches
1.
Set the
Sleeve
Nut t the
Flue Pipe
B and
turn
the
Sleeve
Nut
counterclockwise. Side
the
Outer Flange
and the
Rubber
Packing
onto
the
Flue Pipe
B.
(Figure
14)
Rubber
Packing
\Rubber
Packing
^
'•
-n
J^
((((
i
ytr
V
r-
Sleeve
Nut
Outer Flange
Fig.
14
;
I
L
IF
Sk
o
/
1
ut
/
F
;eve
er
Flange
"lue
Pipe
B
Nut
2.
Spread
caulking
material
on the
inside
of the
Rubber
Packing
if
required. (Figure
12)
3. It is
imprtant
to
keep
the
"UP" mark
on the
Rubber
Packing
at the top
while screwing
in the
Flue
Pipe
B.
Hold
the
Rubber packing
in
place while screwing
in
the
Flue Pipe
B
until
it is the
tight. (Figure
13)
4.
Turn
the
Sleeve
Nut
clockwise
and
tighten.
(Figure
15)
Rubber Packing
Flue
Pipe
A /
Outer
F|ange
Sleeve
Nut
Flue Pipe
B
Fig.
15
12