Specifications

MONITOR HEATING SYSTEMS
Table
of
Contents
Section
1:
Description
1-1
Specifications
(M-2400)
1-2
Special Features (M-2400)
1
-3
Safety Features (M-2400)
1-4
Specifications (M-2200)
1-5
Special
Features (M-2200)
1-6
Safety Features (M-2200)
1-7
Description
1-8
Spill
Tray
1-9
Heater Cabinet
1-10 Combustion System
1-11
Combustion Chamber
1-12 Burner
Pot
1-13
Combustion
Ring Assembly
1-14 Flame Sensor
1-15
Igniter
1-16 Combustion
Air
System
1-17
Flue
Pipe
1-18
Combustion
Blower
Motor (M-2400)
1-19 Heat Exchanger
1-20
Air
Circulation
Fan
Page
1~10
1-21
Air
Pressure Switch
1-22 Fuel Delivery System
1-23 External Fuel Tank
1-24
Fusible Link Valve
1-25 Fuel Constant Level Valve
1-26
Solenoid Pump
1-27
Electrical System
1-28
Microprocessor
1-29 Temperature Sensor
1-30 Safety Mechanism
1-31 Cloth Covered Exhaust Pipe
1-32
Air
Circulation
Fan
Guard
1-33 Fuse
1-34
Overheat Protector Switches (M-2400)
1-35
Revolution control
of
combustion blower motor
1-36
Combustion Blower Motor (M-2200)
1-37
Overheat Protector Switches (M-2200)
Elements
of
combustion system (M-2400)
Elements
of
combustion system (M-2200)
Section
2:
Installation
2-1
Introduction
2-2
Physical Placement
of
Heater
2-3
Drilling Requirements
2-4
Power Requirements
2-5
Fuel Tank Requirements
2-6
Temperature Sensor Wiring
Requirements
2-7
Building Codes
2-8
Un-packing
2-9
Heater Installation
Installation
Classification (M-2400)
Page
11~27
Installation Classification (M-2200)
Applicable Wall Thickness
of
Flue Pipe
Flue Pipe Clearances
2-10
Installing
an
Extension
Kit
2-11
Typical Monitor Lifter Pump Installations
2-12
Uses
for the
Elbow Adapter
Kit
2-13 Fuel Tank
Installation
2-14 Heater
Installation
Typical fuel line connections
Back
guard (M-2400)
Back guard (M-2200)
Section
3:
Operation
3-1
Introduction
(M-2400)
3-2
Operating Specifications (M-2400)
3-3
Introduction (M-2200)
3-4
Operating Specifications (M-2200)
3-5
Operating
Controls
and
Indicators
3-6
Pre-operation
Check List
3-7
Operation
3-8
Manual Heater Operation
3-9
Automatic
Heater
Operation
Page
28~38
3-10
Programming
the
weekly timer
for
automatic heater operation
3-11
Heat Sensor
3-12
Monitor Shutdown
3-13
Out
of
Fuel
3-14
Recovery from
a
Power
Failure
3-15
Recovery from Overheat Condition
3-16
Recovery from Blown Fuse
3-17 Operation
Control
system
M-2400/2200
Operation timing chart