Installation Guide

www.monoserra.com
INSTALLATION INSTRUCTIONS
OWNERS/INSTALLERS RESPONSIBILITIES
Read all instructions carefully before starting.
It is the owners/installers responsibility to follow all manufacturers written instructions and/or applicable
industry standards. In the absence of any specific manufacturers instructions, revert to the National Wood
Flooring Associations (NWFA) current industry standards. It is the owners/ installers responsibility to carefully
inspect all material for visual defects prior to installation. Boards that are considered imperfect or objectionable
in any way should be used in hidden areas, cut-off or not installed. This product is manufactured in accordance
with industry standards which permit a defect tolerance of no higher than 5%. The defects may be of any type,
whether manufactured or natural. Do not install defective flooring.
Flooring that has been installed shall be deemed acceptable.
JOB SITE CONDITIONS / ACCLIMATIZATION
It is the owners/installers responsibility to ensure that the job-site conditions and subfloors are environmentally
and structurally acceptable prior to installation. Subfloors must be clean, flat, secure and meet the minimum
standards set forth. The manufacturer shall not be held responsible for failures or deficiencies of hardwood
flooring resulting from or related to the subfloor, job-site environmental conditions, or improper storage and
handling. Prior to the products delivery to the job site, the site conditions must be normal living conditionsand
maintained at between 40% - 60% relative humidity and 15- 26 degrees Celsius. The job site must be fully
enclosed and the exterior finishing complete. Gutters and downspouts must be in place, and all exterior grading
should divert water away from the foundation prior to installation. The HVAC system should be on and fully
operational for a minimum of seven days prior to installation. All interior wet trades work (i.e. paint, drywall,
concrete, tiling, etc.) must be completed prior to installation. Deliver all material to the job site to acclimatize for
at least 72 hours, or as long as necessary to meet the proper requirements prior to installation. Store material
in the same environment in which it is to be installed. Do not store material directly on a concrete floor, near
windows or vents. Material must be checked with a moisture meter to ensure that it is in moisture equilibrium
with the job-site environment. Hardwood may be installed above grade or on grade but must NOT be installed
below grade.
RECOMMENDED SUBFLOOR SURFACES
Wood - Subfloor
Minimum 5/8" CDX plywood or minimum 5/8" OSB (flooring underlayment grade). Particle board is NOT an
acceptable subfloor for a staple or nail down installation.
Maximum 16" on center joist construction.
Subfloor must be clean, secure and flat within a minimum of 1/4" over 10 feet.
Hardwood should be installed perpendicular to the joist system.
Moisture content of the wood subfloor should not exceed 12% and should be within 2% of the hardwood floor
being installed. Failure to test for proper moisture content of the hardwood flooring and the subfloor can result
in cupping and/or other problems associated with moisture.
Concrete Subfloor
All new concrete subfloors must be fully cured. They require a minimum of 60 days drying time before a wood
floor can be installed. Follow NWFA guidelines for proper moisture testing on concrete slabs. Moisture
emissions from a concrete subfloor cannot exceed 3 lbs. / 1OOO sq. ft. / 24 hr.
Glue or nail a minimum of 5/8" CDX plywood in accordance with the NWFA guidelines using a vapor retarder.
Do NOT install hardwood if one or more walls are below grade.
Hardwood is suitable to be installed over an in-floor radiant heat system. Any in-floor heating system must be
installed in accordance with theNWFA radiant heat guidelines.

Summary of content (3 pages)