Use & care guide
Installation Preparation
Slai_le,_,_ Sled I_Herior l)i,_hwa,sher
the
Openin, g
• The rough cabinet opening must be 24"
rain. deep, 23-5/8" rain. to 24" max. wide.
The opening height should be 34" rain.
and _5" II/ax,
• The opening should be fl'ee of extraneous
pipes and wires.
34"to35"
Underside
of Countertop
to Floor
ThisWallArea
mustbeFreei
PipesorWires
24"Max
Water
Supply
• Hot water line may enter fl'om either side,
fl'om the rear, or fl'om the floor within the
shaded area shown.
• TtlI'n offwater supply.
• Cut a hole approximately 1-1/2" in diam-
eter to admit water line. Access hole must
be round and smooth.
• Install a hand shut-oil valve in the supply
line in an accessible location, such as under
the sink. (The shut-oil valve is optional, but
recomm ended and may be required by
local codes.)
• Install the hot water line, using no less than
3/8" O.D. copper tubing or 1/9" O.D.
plastic tubing.
• The water line must be long enough to
torm a smooth natural loop with no sharp
bends or kinks between the cutout entry
and fill valve location, centered at the fl'ont
of the dishwasher.
• At!just the water heater to deliver 120°F
rain. water temperature.
• The water pressure of the hot water supply
line must be 20 to 120 psi.
• Before connecting, flush water line to clean
otlt debris.
d
//J
// I
//
// I
X
\
\
\,
X
Shut-offValve
\
,,_
ii
Li
ii
ii
Hot ::
ii
ii
ii
CabinetFace_
RightSideEntry
Approx.40"
SideEntry ...... F_
Approx.30"
fromWall 2" fromFloor