Use & care guide

Installation Preparation
Slai_le,_,_ Sled I_Herior l)i,_hwa,sher
the
Openin, g
The rough cabinet opening must be 24"
rain. deep, 23-5/8" rain. to 24" max. wide.
The opening height should be 34" rain.
and _5" II/ax,
The opening should be fl'ee of extraneous
pipes and wires.
34"to35"
Underside
of Countertop
to Floor
ThisWallArea
mustbeFreei
PipesorWires
24"Max
Water
Supply
Hot water line may enter fl'om either side,
fl'om the rear, or fl'om the floor within the
shaded area shown.
TtlI'n offwater supply.
Cut a hole approximately 1-1/2" in diam-
eter to admit water line. Access hole must
be round and smooth.
Install a hand shut-oil valve in the supply
line in an accessible location, such as under
the sink. (The shut-oil valve is optional, but
recomm ended and may be required by
local codes.)
Install the hot water line, using no less than
3/8" O.D. copper tubing or 1/9" O.D.
plastic tubing.
The water line must be long enough to
torm a smooth natural loop with no sharp
bends or kinks between the cutout entry
and fill valve location, centered at the fl'ont
of the dishwasher.
At!just the water heater to deliver 120°F
rain. water temperature.
The water pressure of the hot water supply
line must be 20 to 120 psi.
Before connecting, flush water line to clean
otlt debris.
d
//J
// I
//
// I
X
\
\
\,
X
Shut-offValve
\
,,_
ii
Li
ii
ii
Hot ::
ii
ii
ii
CabinetFace_
RightSideEntry
Approx.40"
SideEntry ...... F_
Approx.30"
fromWall 2" fromFloor