Installation Instructions
Table Of Contents

Installation
ADJUSTING THE BAKE BURNER
AT SHUTTER (Cont.)
CHECK OPERATION OF OVEN
BROIL BURNER
STEP 11
STEP 12
FINALIZE INSTALLATION
INSTALLATION CHECKLIST
■
■
■ Recheck Steps:
Double check to make sure everything in this
manual has been completed. Rechecking steps
will ensure safe use of the range.
NOTE:
The broil burner must be on and warmed up for 3
min. prior to checking operation.
Broil
Broil
Broil Hi
If the flame is long and lazy, verify the proper
orifice is installed and the regulator is converted
properly for your gas supply.
After confirming correct burner operation,
replace all parts.