Specifications

20
Installation Instructions
UNDER-CABINET INSTALLATION
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: Framing must be capable of
supporting 100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
Cut away enough drywall to expose 2 vertical studs at
the bracket location indicated on the template.
Install a horizontal support at least 1” x 6” between
two wall studs at the top bracket installation location.
The horizontal support must be flush with the room
side of the studs. Use cleats behind both sides of the
support to secure to wall studs.
Reinstall drywall.
1
Centerline of
Installation
Space
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
Centerline of
installation
space
View from rear
cleats
1” x 6” min.
mounting
support
PREPARE THE HOOD
Remove the hood from the box. Remove packaging
and tape.
Remove one screw on each side of the cover on
the electrical panel. Lift off the cover and set aside
with screws.
Stand the electrical panel upright.
Align the screw holes in the bottom of the panel with
the holes on the base of the hood at the front side.
Install 3 screws provided.
Snap the damper into the
exhaust outlet on the top of
the hood.
2
Install
damper
Remove 2 side
cover screws
Electrical
panel
Secure
electrical panel
with 3 screws
Junction box
Inside screw
www.dexpress.com Page 21 of 42 12/1/2010
www.dexpress.com Page 21 of 42 12/1/2010
ZV800SJSS
ZV800SJSS
Cond Inst
Cond Inst