Installation Instructions

10
Installation Preparation
Preparation WITH an Accessory Storage Drawer
NOTE: MODEL ZSC1201 CAN ONLY BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER IF INSTALLED ABOVE 36-3/4
s
.
MODEL ZSC1202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT
AN ACCESSORY STORAGE DRAWER FOR THIS MODEL.
Installation over a GE/Monogram
Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location
do not obstruct the required interior depth
and height. See Warming Drawer installation
instructions for details.
30s
23-1/2s
25-1/4s
Min.
21s
2s Min.
(3
s Recommended)
Per Warming
Drawer
Requirement
Construct Solid
Bottom Min. 3/8s
Plywood Supported
by 2 x 4 or 2 x 2
Runners all Four
Sides
PREPARE THE OPENING (cont.)
The Advantium 120V can be installed in
combination with other GE/Monogram appliances.
Always follow each product’s Installation
Instructions to complete the installation.
Single Advantium 120V Installation:
Order a 30s wide single oven cabinet or cut
the opening in a wall to the dimensions shown.
$OORZs case trim overlap on the sides,
1-1/16s overlap on the top and 7/8s overlap
on the bottom of the opening for all models.
2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2s between the two
openings. This separation will provide clearance
for bottom overlap of the Advantium 120V and the
other appliance overlaps.
Construct a solid oven floor of 3/8s min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG
flush with the bottom edge of the cutout.
30s
23-1/2s
25-1/4s
Min.
21s
Construct Base
Min. 3/8s Plywood
Supported by 2 x
4 or 2 x 2 Runners
all Four Sides
PREPARE THE OPENING (cont.)
36-3/4s
Min.*
* Required for
Monogram models
* Required for
Monogram models
36-3/4s
Min.*